Loading...
Pecan Hollow-CS 910301 DA~ M. DOWDEY AND ASSOCIATES --~C. CIVIL ENGINEERS 16250 DALLAS ~RKWAY SUITE 100 (214) 931-~94 ~X (214)931-9538 City Eng~er City of/Coppell P. O. Box 478 Coppell, Texas 75019 RE: PECAN HOLLOW ADDITION ~- Doar Shohre: Dur~n~ the pavomen~ construction of Bod~o Road, khe pavin~ contractor~ Glenn Thurman~ Inc. discovered that at the centerline of tho ex~st~n~ Bod~o Road, tho previous pav~n~ contractor had constructed a keyway {see s~andard details) and had left steel re~nforcin~ oxtondod to t~o to tho now pavomont soc~ons~ ho~over~ this stoel ~s rusted and should not be usod to tie ~ho bars Tho roason that tho approvod plans havo a OhO-foot sawcuk l~mi~ is ko mako a ~ood 3o~nt connoct~on betwoen the old ex~st~n~ and proposed pavomen~. Due to tho aforementioned koyway~ th~s sawcut ~s no longer necossary~ howevor~ due to the poor condition of the steel, I rocommond thak wo dr~ll~ and opoxy tho dowels as previously required. Please process th~s chan~e as soon as possible and let harry Dav~s know of your doc~s~on. Thank you. Very truly yours~