Loading...
Pecan Hollow-CS 901128 FILE COPY November ?.8, 1990 =. ~:,''''-'':'-'-'''=--. L; .<..,: : ... ¥.' --' '" Pecan Hollow Joint Venture :~ J~ 16250 Dallas Parkway :'i\\ ' ' Suite 200 :-~ ~ W~ 1/,~ Dallas, Texas 75248 _. RE: Pecan Hollow Development Coppell, Texas Dear Mr. Cameron: This letter shall summarize the agreement which I believe has been reached between us as to the channel widening and excavation, and the construction of storm drainage facilitie~ the drainage channel along Lots 1 through 16 (inclusive), cf Block C of the Pecan Hollow Addition to the City of Coppell, Texas (the "Lots"), as addressed in my letter of May 21, 1990, you. In return for your compliance with the covenants and conditions as are set forth herein, ABQ Federal Savings Bank ("ABQ") does hereby authorize Pecan Hollow Joint Venture (PHJV~: to enter upon ABQ's property contiguous to the Lots for the purpose of widening and excavating the channel and for constructing storm drainage facilities. PHJV agrees (i) to widen and excavate the drainage as described in Alternative No. 1 - Channel Widening and Slope of the aforesaid letter and as is more particularly forth (a) as Alternative No. 2 in the plans, prepared by Dar] Dowdey & Associates, entitled "Channel Improvements North of Pecan Hollow Add'n, Coppell, Dallas Co., Texas" dated 5-2-90 revised 5-4-90, and (b) on sheet 1 of 4 in the plans prepared Dan M. Dowdey & Associates, entitled "Lot Grading Plans - Pecan Hollow Addition" dated March, 1990 (collectively the "E×cavat~cn Plans"); and (ii) to construct the proposed storm drainage improvements (The "Storm Drain Improvements") ~ithin the draina~:o channel as described (a) in the storm sewer construction plan~ for lines A, B, C, and C-l, for Pecan Hollow Addition as sho%..,~] sheets 2, 3, and 6 dated March 1990, and bearing the seal of M. Dowdey, Registered Professional Engineer and (b) in those plans bearing the seal of Dan M. Dowdey, Registered Professiona! Engineer, dated March, 1984, and being sheet SD-14 of the Standard Construction Details - Storm Sewer entitled "Itead Wall Details" (collectively the "Storm Drain Improvements Plans") such design changes as are necessitated by (x) a 4:1 channel slope, rather than the slopes as shown on such plans; Mr. Doyle Cameror November 28, 1990 Page 2 and (y) the orientation of the head walls at an angle to the channel side slope (rather than perpendicular to the side slope as shown on such plans). PHJV also agrees that the head walls at storm drain discharge points should conform to or be slightly recessed into the proposed south channel side slope to avoid presenting an obstacle to drainage flow in the channel. The channel widening and excavation and the construction of the Storm Drain Improvements in accordance with the Excavation Plans and Storm Drain Improvements Plans (with the aforesaid design and orientation changes) are herein collectively referred to as the "Drainage Work." You agree that all Drainage Work shall be performed by you or your subcontractors, agents, or employees or others under your control and direction and that such Drainage Work shall be performed at you sole cost and expense. You agree that you not permit any mechanic's or materialman's lien to be filed arising or resulting from the Drainage Work, which covers or affects any portion of the property presently owned by ABQ, and that if any such lien is filed, that within twenty (20) days after ABQ notifies you of the existence thereof, you will obtain a release of the prohibited lien, or provide a bond satisfactory to ABQ, in its sole discretion, to pay the amount alleged to be due by the holder of such lien. You further agree that all Drainage Work shall be: i) Performed without material deviation from the Excavation Plans and Storm Drain Improvements Plans (except for changes necessitated by the 4:1 channel slope and orientation of the head walls at an ang]e~ ~ ii) Performed in a good, workmanlike manner; iii) Diligently pursued to completion after being ccmmence~i~ and iv) Performed without injury or damage to ABQ's property located outside of the drainage channel (and if there is any such damage that it will be repaired and/or property restored immediately upon completion of the Drainage Work). After completion of the Drainage Work, you shall notify who shall have the right, but not the obligation, to inspect Drainage Work to insure that same has been completed in accordance with the terms of this letter agreement. You agree tc complete, reconstruct, or redo any Drainage Work that is found not to have been constructed in accordance with this letter agreement. Mr. Doyle Cameror November 28, 1990 Page 3 ABQ shall have no responsibility or liability for the design or impact of the proposed storm drainage system or improvements constructed to serve the Pecan Hollow Addition or otherwise in connection with the plans and/or specifications and shall have no responsibility or liability for the adequacy thereof or for the construction of any improvements contemplated by such plans and/or specifications. PHJV agrees to and shall indemnify and hold harmless ABQ, its officers, agents, employees, and successors and assigns of and from any liability, actions, damages, lawsuits, including attorney's fees and court costs, and/or claims or any character, type, or description (including, without limitation, any and all claims for damages of every kind, for injury to or death of any person or persons and for damage to or loss of property) arising out of, attributed to, or in any way connected with the Drainage Work. Upon the execution and delivery of this letter agreement to ABQ, you are authorized to enter upon ABQ's property contiguous to the Lots to perform the work necessary to widen and excavate the drainage channel. However, you have no authority to enter upon said property (and it shall be a condition precedent to your right of such entry) to perform the work of constructing the proposed Storm Drain Improvements to be located in the drainage channel until the following matters have been accomplished: i) PHJV's execution and delivery to ABQ of storm drainage easements covering the areas where the Storm Drain Improvements are to be constructed and a reciprocal drainage easement providing for the drainage flow along the back 23 feet of the Lots (including the 15' easement dedicated on the plat of the Pecan Hollow Subdivision) in form and content acceptable to ABQ and its legal counsel; and ii) Revisions are made to the Pecan Hollow Home Owner's Association documents providing for restriction on grading and fence construction and for maintenance of the drainage easements, etc., as are mutually satisfactory to ABQ and PHJV and their respective counsel. Until the aforesaid two conditions have been satisfied, you shall have no authority to proceed with the construction of the Storm Drain Improvements on ABQ's property. PHJV further agrees that within six (6) months after the date of this letter agreement it shall have: i) Completed the widening and excavation of the channel. ii) Satisfied the conditions precedent to beginning construction of the Storm Drain Improvements, and Mr. Doyle Camero~ November 28, 1990 Page 4 iii) Completed construction of the Storm Drain Improvements. If the foregoing correctly sets forth your understanding of the terms of our agreement, please so indicate by signing this letter hereinbelow, and returning same to me. When you have signed this letter, it will represent the complete agreement between us and no further formal contract will be necessary. Very truly yours, ABQ FEDERAL SAVINGS BANK By: The Resolution Trust Corporation, as Conservator for ABQ Federal Savings Bank BY: ... " ,~ ...... , S~L~fi'''stric~man; Senior Vice President of ABQ Federal Savings Bank and AGREED TO AND ACCEPTED: Under Delegation of Authority From Charles C. Mann, Managing PECAN HOLLOW JOINT Agent of ABQ Federal Savings VENTURE Bank, acting under authority of '"..,. that certain delegation of . authority dated August 20, By: O- ~ 1990, from James D. Densmore, Authorized Venturer Deputy Regional Director, Western Region, The Resolution Trust Corporation