Pecan Hollow-CS 900727 Coppell, Texas 75019
The City With A Beau~7,1~I-~[~TRUCTION PACKET 214- 462- 0022
ATI'ENDANCE SHEET
NAME: COMPAN~: PHONE:
:' ,: .,.. f9 ~ A ~-.~ .,..: .., ,: ...
~ .~ ~ "~., ". ,. ·
/~,y./ [':~,, ff~,/,4,- ~, ~' t4~..,,a ~,,~ ~'~z-/~/~'
'~; ' ~I '
'~L-t ....¢~'/... ;.-.~ '-~.
--'~ ~;~:r ......
~ ¢ ,~ ~a ~~ ~.; ¢ ~-" ::' '~ ~ ~ t [ f, ~-'
( 1 )
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
ASSIGNED INSPECTOR:
I. ATTENDANCE: ( See Attached
II. PLANS FURNISHED TO: A) CITY YES ~'/'NO
B) CONTRACTOR YES L--" NO
C ) CWNER YES
III. UTILITY COMPANIES NOTIFIED:
A ) TELEPHONE
B) GAS
C ) ELECTRIC
D) CABLE T.V.
IV. STATUS OF RIGHT-OF-WAY ~%ND/OR LAND DOCUMENTS:
EASEMENTS YES NO
HIGHWAY PERMIT YES NO
RAILROAD PERMIT YES NO
STREET CUT PERMIT YES NO
BORING PERMIT YES NO
V. INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
B. AFI~R HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
RATES".
C. CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST I~ENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SEWER/STORM SE~R/
PAVING CONSTRUCTION BEGINS.
(2)