Loading...
Pecan Hollow-CS 900202 "' ~,- ~ ~. :~ ~,~ C i t 7' E ~ ~ g ~. ~ ~- r '~ ~c~ ~z :~: P. O. B,';x Coppell,/ Texas 75019 RE: Tc%n- Center Area Development Plans Dear Pt:,,%se].] - In response co }ou'~ .Letter dated January 29, 1990, ABQ pre,,;ently n~s no pi. an.: fo'r- t.be referenced channel. ABQ will not ~eve].o;.~ any Lmprove~,ent plans for the channel until an "end user" is in piace for the 'land adjacent to the channel. The i, Fp~)v~ments ~h~t are planned along with the Heartz Road ':onstruction are interim. The "conceptual design" approved via an agreement with the i'ar~ ~ cf Coppe].]. Joint Venture II is that, a conceptual approval. When the ct~an],.el imi ro'..,eme~t plans are developed they will be in cump~._~sn,:e ~i.%'h the existing city standards and ordinances at that. t~ '[ unders%and tP. at the "Pecan Hollow" development may have runoff iraining into the ckannel. Please take notice that the channel at th Ls time is orivate and any drainage entering the ct anne] mus~ be via an easement. I do not believe the City has the '~ight to approve public runoff draining into a private ckannel w L'tnout an agreement with the owner. This was not done ,,,~th the Warrem Clarke 5raft ,4hic:h now drains into the channel. ~].e~:se Let ,l~rry P~rc:~e' of Jerry Parche' Consulting .Eqci~-ec~:, cr ABQ ~ o% if there Ls runoff draining into the ~::]a ]nel. v;e wl] 1 need to analyze the situation to see if there are uay dc~wnstream imp[ovements needed.