Loading...
Pecan Hollow-CS 900129 COPPELL PUBLIC WORKS MEMORANDUM DATF.: January 29, 1990 TO'. Shoh3'e Daneshmand, Civil Engineer FROM: Russell Doy!~./~ ity Engineer i' t ~,'~ RE,: Pecan Hollow Subdivision Drainage As r underst, al,d subject development is out falling into the Linear Lake to the north/northeast and as i understand was to outfall along Lodge Road per previous agreements and drainage plans. In order to check this out, please get from our files and/or from the Design Engineers, Threadill-Dowdy and Associates, the following: ~c~.) ~ . . . ~'i~'-e..- D~'ainage Plan referenced in the contract for sale ~?.KO ~2, agreen,e.q~ between ABQ and the Parks of Coppell Joint Venture ~ ~..~, (Uni'~est) dated Decembe.~ 30, 1982 (Page 4 paragraph C). Water ~'~' b.t detention areas are referred to. ~.~,~ ~'~"' ' ! 2. Page 7, Section VI refers to a perimeter survey for Park and/ ~ To~n Center site. ~ "'"'% -'- ,/ 1 ,'$.' Conceptua! design plans for this Linear Lake system referred ...'./.~"-nc.~ ~ ro oq pag,~. 7, paragraph 16 of the amenchnent (to that contract ~¢~r~ of sal~) dated January 27, 1987. i ~'la~s 1 th-'u 4 Jast revised 9/3/86 indicating 5 locations\ ~e' ~;~,,:~ '~onq r. he Denton Creek with drainage improvements as referredJ ' ' :¢, on page 7, paragraph 26 in the amendment agreement. ~] While we need to look at only item one at this time, we need to make sure we have items 2 & 3 for future use and if you have to contact Dowdy, you can get the other two at the same time. PECAN.