Loading...
Park West CC(09)-LR 960214REPORT NO.: PROJECT: LOCATION: reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT 1 2700.1 02/07/96 JOB NO.: DATE CAST: Parkwest Commerce Center - Phase II Junction box walls - line D, STA 0+00 SPECIFICATION: QUAN~TYREPRESENTED: 4000 PSI 9/9 yds ARCHITECT/ENGINEER: CONTRACTOR: McFadden & Miller Myers & Crow Company REPORTED TO: DATE: SAMPLEDBY: M. Lawson BY ORDER OF: 02 / 14 / 960RDER NUMBER: (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SQ. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: COMPRE~IVE STRENGTH, PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: PW020701 109,000 7 3860 LABORATORY NUMBER PW020702 28 PW020703 28 METHOD OF CURING: FIELD DAYS, LABORATORY FROM 1 02/08/96 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 73 °F M,X 8 0 'F, AIR CONTENT SLUMP 3.00 TIME OF SAMPLE: 0 3 : 3 0 A~['PM. PICK-UP CHARGE: SOURCE OF CONCRETE: P i one e r M~X COOE: 9 3 6 3 TICKET NO.: 42 676 6 INCHES NO FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): UNIT WEIGHT PCF YIELD CF/CY . Richard C DISTRIBUTION: (1) Myers & Crow Company, Ltd./Mr ~,~/ (1) McFadden & Miller/Mr. Dave VanDemeer (1) Comerica Bank/Mr. Alan Williams (1) AECC, Inc./Mr. Andy Brundige (1) City of Coppell/Mr. Lee Stone ~J~) City of CoppellL r r v' T~TI~'"rHLo~: ~M ~, ~, C1~173. C~%,ORC,~ PAGE ~ OF 1 (1) O'Brien * Dietz & ~ssocla~es. inc./~r. ~ ~zsw~n~er -- 2424STUTZDRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/35~5600 · (~X)214/35~0019