Loading...
Park West CC(12)-LR010125GEOTECHNICAL AND ~ ~ O U F== ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Parkwest Commerce Center - Building 4 Enterprise Drive at Wrangler Drive Coppell, Texas REPORTED TO: CONTRACTOR: Location of Sample Pritchard Associates 2501 State Street Dallas, Texas 75201 ATTN: Mr. Roger Dahlin McFadden & Miller, Inc. Set Number I Location 1 Pier # D-9 REPORT NO. 18 REG PROJECT NO. 4772 SAMPLE DATE: 01-25-01 TECHNICIAN: C. McEntee Quantity Represented 10/22 Design Information I Source of Set Number Concrete Mix Identification Specified Strength p.s.i. 1 TXl 19 3000 Test Results Set Cylinder I Age @ Total Load Compressive I Average Strength No. ID J Date Tested Test lbs. Strength p.s.i. J p.s.i. 1 3168 02-01-01 7 81260 2880 3168 02-22-01 28 120340 4260 3168 02-22-01 28 126730 4490 4380 3168 Hold H Cylinder Data Set Cylinder [ N~. ID Slump 3168 5.50 Concrete Air I Air Temp. Temp. Entrainment 10:50AM 53 55 N/A Time of Ticket Sample Number 2814203 Distribution: (1) Pritchard Associates/ Mr. Roger Dahlin (1) O'Brien & Associates/ Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie (1) McFadden & Miller/ Mr. Jon Jacobson (1) Halff Associates/Mr. Dave Littleton (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed I~y Keith E. Atkins KEA/je 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND J~ J==;j I'-'1 I I j==l ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Parkwest Commerce Center - Building 4 Enterprise Drive at Wrangler Drive Coppell, Texas REPORTED TO: Pritchard Associates 2501 State Street Dallas, Texas 75201 ATTN: Mr. Roger Dahlin CONTRACTOR: McFadden & Miller, Inc. Location of Sample I Set Number J Location 1 Pier # D-9 REPORT NO. 18 REG PROJECT NO. 4772 SAMPLE DATE: 01-25-01 TECHNICIAN: C. McEntee J Quantity Represented 10/22 Design Information I I Source of J Set Number Concrete 1 TXI Mix Identification Specified Strength p.s.i. 19 3000 Test Results Set Cylinder I Age@ I TotalLoad Compressive I Average Strength No, ID Date Tested Test lbs, Strength p,s,i, p.s,i. 1 3168 02-01-01 7 81260 2880 3168 02-22-01 28 3168 02-22-01 28 3168 Hold H Cylinder Data Set Cylinder J Concrete Air Time of Ticket N1o. ID Slump Air Temp. Temp. Entrainment Sample Number I 3168 5.50 10:50AM 53 55 N/A 2814203 Distribution: (1) Pritchard Associates/ Mr. Roger Dahlin (1) O'Brien & Associates/ Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie (1) McFadden & Miller/ Mr. Jon Jacobson (1) Halff Associates/Mr. Dave Littleton (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/je 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019