Park West CC(12)-LR010125GEOTECHNICAL AND ~ ~ O U F==
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Parkwest Commerce Center - Building 4
Enterprise Drive at Wrangler Drive
Coppell, Texas
REPORTED TO:
CONTRACTOR:
Location of Sample
Pritchard Associates
2501 State Street
Dallas, Texas 75201
ATTN: Mr. Roger Dahlin
McFadden & Miller, Inc.
Set Number I Location
1 Pier # D-9
REPORT NO. 18
REG PROJECT NO. 4772
SAMPLE DATE: 01-25-01
TECHNICIAN: C. McEntee
Quantity Represented
10/22
Design Information
I Source of
Set Number Concrete Mix Identification Specified Strength p.s.i.
1 TXl 19 3000
Test Results
Set Cylinder I Age @ Total Load Compressive I Average Strength
No. ID J Date Tested Test lbs. Strength p.s.i. J p.s.i.
1 3168 02-01-01 7 81260 2880
3168 02-22-01 28 120340 4260
3168 02-22-01 28 126730 4490 4380
3168 Hold H
Cylinder Data
Set Cylinder [
N~. ID Slump
3168 5.50
Concrete Air I
Air Temp. Temp. Entrainment
10:50AM 53 55 N/A
Time of Ticket
Sample Number
2814203
Distribution:
(1) Pritchard Associates/
Mr. Roger Dahlin
(1) O'Brien & Associates/
Mr. Mick Granlund
(1) Technistructures/Mr. Keith Leslie
(1) McFadden & Miller/
Mr. Jon Jacobson
(1) Halff Associates/Mr. Dave Littleton
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed I~y
Keith E. Atkins
KEA/je
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND J~ J==;j I'-'1 I I j==l
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Parkwest Commerce Center - Building 4
Enterprise Drive at Wrangler Drive
Coppell, Texas
REPORTED TO: Pritchard Associates
2501 State Street
Dallas, Texas 75201
ATTN: Mr. Roger Dahlin
CONTRACTOR: McFadden & Miller, Inc.
Location of Sample
I Set Number J Location
1 Pier # D-9
REPORT NO. 18
REG PROJECT NO. 4772
SAMPLE DATE: 01-25-01
TECHNICIAN: C. McEntee
J Quantity Represented
10/22
Design Information
I I Source of J
Set Number Concrete
1 TXI
Mix Identification
Specified Strength p.s.i.
19 3000
Test Results
Set Cylinder I Age@ I TotalLoad Compressive I Average Strength
No, ID Date Tested Test lbs, Strength p,s,i, p.s,i.
1 3168 02-01-01 7 81260 2880
3168 02-22-01 28
3168 02-22-01 28
3168 Hold H
Cylinder Data
Set Cylinder J Concrete Air Time of Ticket
N1o. ID Slump Air Temp. Temp. Entrainment Sample Number
I
3168 5.50 10:50AM 53 55 N/A 2814203
Distribution: (1) Pritchard Associates/
Mr. Roger Dahlin
(1) O'Brien & Associates/
Mr. Mick Granlund
(1) Technistructures/Mr. Keith Leslie
(1) McFadden & Miller/
Mr. Jon Jacobson
(1) Halff Associates/Mr. Dave Littleton
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/je
2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019