Loading...
Park West CC(12)-LR010108 GEOTECHNICAL AND J E~ I~1 r-~ U ~" ENVIRONMENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 68 REG PROJECT NO. 7044 SAMPLE DATE: 01-08-01 TECHNICIAN: B. Steadman Location of Sample ISet Number I Location I Quantity Represented 1 Screenwall Piers: 28, 29, 30 & 31, bottom half of 32 10/25 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 9505 3000 Test Results Set Cylinder I No. ID Date Tested 1 2740 01-15-01 2740 02-05-01 2740 02-05-01 2740 Hold Test lbs. Strength p.s.i. Strength p.s.i. 7 108850 3850 28 161200 5710 28 162150 5740 Hold 573O Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 2740 4.75 1:05 PM 57 60 N/A 2805299 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC, Odginal Signed By Keith Atkins KEA/mm 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019