Park West CC(12)-LR010103REPORTED TO:
GEOTECHNICAL AND
ENVIRONMENTAL C, ONSULTANTS
2501 State Street REPORT DATE: 01-03-01
Dallas, Texas 75201 REG PROJECT NO. 4772
ATTN: Mr. Roger Dahlin TECHNICIAN: C. Johnson
PAGE: 1 of 1
CONTRACTOR: McFadden & Miller, Inc.
On these dates a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth I Injection Spacing I Injection Pressure Injection Intervals
(ft) I (ft)I (psi) (in)
10 5 100-200 12-18
Equipment
Numberof I Number of Probes Length of Probes L Probe Spacing
Ri~Is (aa) (ft) (ft)
2 4 11.6 5
Date J Area Injected (sq fi) J Average Pressure (psi) J Pass No.
12-21-00 14,000 180 1
12-22-00 22,000 180 1
Surfactant added at regular intervals: Yes
Distribution: (1) Pritchard Associates/
Mr. Roger Dahlin
(1) O'Brien & Associates/
Mr. Mick Granlund
(1) Technistructures/Mr. Keith Leslie
(1) McFadden & Milled
Mr. Jon Jacobson
(1) Halff Associates/
Mr. DaveLittleton
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW/myw F ~' ~
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019