Loading...
Park West CC(12)-LR010117GEOTECHNICALAND G F;I r"3 I I I=~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Parkwest Commerce Center - Building 5 Enterprise and Wrangler Coppell, Texas REPORTED TO: Pritchard Associates 2501 State Street Dallas, Texas 75201 ATTN: Mr. Roger Dahlin REPORT NO. 3 REPORT DATE: 01-17-01 REG PROJECT NO. 7479 TECHNICIAN: C. Johnson PAGE: 1 of 1 CONTRACTOR: McFadden & Miller, Inc. On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing I Injection Pressure Injection Intervals (ft) (ft) I (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes I Length of Probes Probe Spacing Ricjs (ea) J (ft) (ft) 2 4 11.5 5 I01-09-01 10,000 180 1 01-11-01 2,000 180 1 Date J Area Injected (sq ft) J Avera~le Pressure (psi) J Pass No. Surfactant added at regular intervals: Yes Mail Distribution: (1) (1) Pritchard Associates/ Mr. Roger Dahlin O'Brien & Associates/ Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Halff Associates/Mr. Dave Littleton (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/mm 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 ,, FAX [214] 350 0019 GEOTECHNICALAND J~ R r-I I I ~ ENVIRONMENTAL CONSULTANTS REPORTED TO: REPORT OF WATER INJECTION OBSERVATION Parkwest Commerce Center - Building 5 Enterprise and Wrangler Coppell, Texas Pritchard Associates 2501 State Street Dallas, Texas 75201 ATTN: Mr. Roger Dahlin REPORT NO. 4 REPORT DATE: 01-17-01 REG PROJECT NO. 7479 TECHNICIAN: C. Johnson PAGE: 1 of 1 CONTRACTOR: McFadden & Miller On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Injection Depth (ft) Specification Injection Spacing J Injection Pressure Injection Intervals (ft) J (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes I Length of Probes Probe Spacing Rigs (ea) J (ft) (ft) 2 4 11.6 5 Date J Area Injected (sq fi) J Average Pressure (psi) J Pass No. 01-13-01 16,000 180 1 01-15-01 26,000 180 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/ Mr. Roger Dahlin (1) O'Brien & Associates/ Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Halff Associates/Mr. Dave Littleton (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019