Loading...
Pecan Valley-CS 910619 '.,~='.~J /i-.%'_'.==,/l---_==,.--~,~~ !.-.-.' i=L___. P.O. Box 478 Coppell. Texas 75019 (__7,,/(/'"~/,~-~/,___/ The City With A Beautiful Fu,ure 2~,4- 462-0022 ~" /~"-"~ PRE-CONSTRUCTION PACKET ~I, ~.,: CITY OF COPP'ELL PRE-CONSTRUCTION CONFERENCE 6- ASS IGNED INSPECTOR: I. ATI~ENDANCE: (See Attached List) II. PLANS ~RNISHED TO: A) CITY YES L/NO B ) CONTRACTOR YES NO C ) ~N~R YES NO III. UTILITY COMPANIES NOTIFIED: A) TELEPHORqE C ) F_&ECTRIC D) C~mLE T.V. E ) OTHER ~IV. STATUS OF RIGI~-OF-W~Y AND/OR LAND DOCUMENTS: EASEMENTS YES ~' NO HIGHWAY PERMIT YES NO RAILROAD PERMIT YES NO STREET CUT PERMIT YES NO BORING PERMIT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR B. AFTER HOURS AND ~EKENDS (OVERTIME) TO BE PAID BY T~JE CON~%CTOR "AT OVERTIME RATES" C. CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST YWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY S~2R/STORM SEI4ER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1, DENSITIES 2, · APPROVED CONCRE_~E BATCH DESIGN 3, CONCRE?E PAVING INCLUDING CORES 4. APPROVED ASPH~J~T BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTrQ%CTOR TO NOTIF'~f THE CITY, POLICE AND FIRE DEPARTMEN~ SEVEN~Y-TWO (72) HOURS IN ADVANCE. . VIII, CONSTRUCTION BAIhRICADES MD TRAFFIC CONTROL: A, REQUIRED YES NO B, T~.r~FF!C DETOUR YES C, W,~RNiNG LIGHTS YES IF STREET DEPARTMENT ~b~S TO COb~ OL~r TO MOVE I~{E BARRICADES AND/OR REPLACE A~rf BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING ~-~% CORRECT "~$-BUILT" PLANS TO T~ CITY. X. I NFO~MAT ION: DEVELOPER: NA~ME: ADDP~ESS: PHON~: PROJECT 5PINAGER: ,.ONcE=TING ENGINEER: ADDRESS: PHONE: PROJECT ENGINEER: (3)