Loading...
Pecan Valley-CS 910306 am& CULLUM CONSTRUCTION COMPANY, INC. MUNICIPAL CONTRACTORS -- 9 Post Office Box 8455 Dallas, Texas 75205 By: Engineering March 6, 1991 Engineering Department City of Coppell P.O. Box 478 Coppell Texas 75019 Attn: Mr. Larry Davis Re: Pecan Valley Addition Dear Larry; We have now completed all of our pipe work on the Pecan Valley project. This includes all water & sewer testing, televising, and compaction testing. The T V inspection showed a small drip from one of the sewer services, and we repaired a cap at this point. We also noted a small amount of standing water just out of two of the manholes on the flattest portions of the sanitary sewer, but we believe these to be in the 1/2" deep range, and should be well within the allowable for the little amount of fall in the line. The paving contractor is planning on starting their work on Monday the 9th, and we would appreciated you accepting the utility work to date, to allow the paving to be done. As soon as you give us the go-ahead, we will abandon the existing sewer system and reroute it into the new line. Please let me know if you have any questions concerning this matter. Sincerely yours, Philip Cullum Sr. Vice-President cc: Dan Dowdey & Associates Engineers Bill Anderson