Loading...
Pecan Ridge-CS 911022 MEMO TO: Councilman Jim Cowman VIA: ~. Gary L. Sieb, Director of Planning and Community Services FROM:'J ~rry Davis, Construction Inspector SUBJECT: Lod§e Road Opening DATE: October 22, 1991 With reference to our telephone conversation today, Lodge Road will not be open until around November 1, 1991. Lodge Road is currently under construction along with the development of two new subdivisions -- Pecan Ridge adjacent to the west boundary of Lodge Road and Pecan Valley adjacent to the east boundary of Lodge. The developer has programed the construction of Lodge Road with the construction activity of the two subdivisions mentioned above. A walk thru for paving inspection for Lodge Road is scheduled for Friday, October 25, 1991 at 1:30. If construction is found to be complete and acceptable to City staff, Lodge Road will be open to thru traffic at that time. However, as is generally the case, there are usually several "punch list" items which must be addressed before a road can open to the public. Once the punch list has been completed, the road opens to general traffic. In this case, we envision all concerns to be addressed no later than November 1, 1991. If I can be of further assistance, please notify me at 393-1016. CnD/bd cc: Alan D. Ratliff, City Manager COWMAN