Loading...
Northlake WE P1-6-LR 850808TO SOIL AND FOUNDATION ENGINEERING / CONSTRUCTION MA TERIALS TESTING Houston: 2055 Silber Rd. Suite 10OB 177055) Phone: 713-956-2130 Dallas: 11127 Shady Trail. Suite 106 175229) Phone: 214-484-4731 FIELD SOIL MOISTURE - DENSITY TEST REPORT Crawford Utilities P.O. Box 367 Rockwall, Texas 75087 PROJECT Northlake Woodland East #6 FIELD TEST DATA DATE 8/8/85 REPORT NO. 85-3015C-5 % OF TEST ~ SUBGRADE DRY DENSITY MOISTURE MAXIMUM 7J FILL ~. 4 LOCATION LBSJCU. FT. % DENSITY NO. LIFT NO.j~il~ 14 Sanitary Hawk 100.1 ~-~8 83.1 Sewer .... 15 Hawk 103.7 10.1 86.1 16 Meadowlark 107.2 ~ 90.0 17 Meadowlark 103.0 /'16.2 ~ i 85.5~ FIELD TEST METHOD: [] VOLUMETRIC ASTM D.2167.77 ~ NUCLEAR ASTM, D.2922-81 [] SAND CONE ASTM, D-1556-74 TYPE OF MATERIAL MAXIMUM DRY DENSITY METHOD OF TEST: PERCENT COMPACTION REQUIRED Tan Sandy Clay 120,5 PCF [] STANDARD ASTM, D-698 OPTIMUM MOISTURE 10.6 PERCENT ~ MODIFIED ASTM,~1557 ~ 95 PERCENT NOTE: TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS EXCEPT THOSE MARKED* INSPECTOR: Gary Grubbs TIME: 2 hours TO SOIL AND FOUNDATION ENGINEERING / CONSTRUCTION MA TERIALS TESTING FIELD SOIL MOISTURE - DENSITY TEST REPORT Crawford Utilities DATE P.O. Box 367 Rockwall, Texas 75087 Houston: 2055 Silber Rd., Suite IOOB 177055) Phone: 713-956-2130 Dallas: 11127 Shady Trail. Suite 106 (75229) Phone: 214-484-4731 8/8/8s PROJECT Northlake Woodland East #6 REPORT NO. 85-3015C-5 (con't) FIELD TEST DATA % OF [] SUBGRADE DRY DENSITY MOISTURE MAXIMUM TEST [] FILL LOCATION LBS./CU. FT. % NO. LIFT NO. F~a~ DENSITY 18 Sanitary Flamingo 89.7 10.9 74.4~ Sewer 19. Flamingo 111.7 14.9 92.7 FIELD TEST METHOD: TYPE OF MATERIAL MAXIMUM DRY DENSITY METHOD OF TEST: [] VOLUMETRICASTM D.2167-77 Brown Clayey Spn4 112.9 PERCENT COMPACTION REQUIRED [] NUCLEAR ASTM, D.2922-81 E] SAND CONE ASTM, D-1556-74 PCF OPTIMUM MOISTURE 13 . 2 PERCENT MODIFIED q~ PERCENT NO TE: TEST RESUL TS COMPLY WITH PROJECT SPECIFICATIONS EXCEPT THOSE MA RKED* INSPECTOR: Gary Grubbs TIME: