Loading...
Park West CC(13)-CS 910507P.O, Box 478 Coppetl, Texas 75019 214 - 462 - 0022 ' ATTENDANCE SF~ET COMPANY: PHONE: (~) CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE TIME: ASSIGNED INSPECTOR: I. II. ATTENDANCE: ( See Attached List ) PLANS FURNISHED TO: A) CITY B ) CONTRACTOR C ) C~NER YES C/NO YES C-'"'~NO YES ~'"~ __ III. IV. UTILITY COMPANIES NOTIFIED: A ) TELEPHONE B) GAS C> ELECTRIC D) CABLE T.V. E) OTHER STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: ~ EASEMENTS YES NO HIGHWAY PERMIT YES NO RAILROAD PERMIT YES : ~.~_ STREET CUT PERMIT YES BORING PERMIT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORMSEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. VII. VIII. TESTING OF MATERIALS: 1. DENSITIES 2. ~APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF T~ TEST REPORTS TO THE INSPECTOR STREET CLOSING REQUIRED: YES IFYES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-YWO (72) HOURS IN ADVANCE. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED B. TRAFFIC DETOUR YES C. WARNING LIGHTS YES IF STREET DEPARTMENT HAS TO COME OUT TO MOVE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. YES IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TOT HE CITY. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)