Park West CC(14)-CS 951115ENGINEERING - STREET DIVISION
MEMORANDUM
DATE:
TO:
FROM:
RE:
November 15, 1995
Larry Davis, Construction Inspector
Per Birdsa11, Interim Street Superintendent~
Walk Thru for Park West Commerce Center
A walk through was conducted at the above referenced location
today. The following deficiencies were identified:
Driveway approach at Airline on west side of driveway -
- saw joint missing -- needs to be placed.
North drive on Executive -- saw joints are missing in
this drive. Please place and seal.
Ail curb returns need to be sealed, including the
redwood headers.
Would like 4 safe hit posts on the east side of
driveway on Wrangler around RCP head wall·
PB/bc