Loading...
Park West CC(14)-CS 950322MEMORANDUM To: From: RE: Date: Alan Johnson, Finance Director Kenneth M. Griffin, P.E., Assistant City Manager/City Engineer Parkwest Commerce Center Block 7, Lot 5 March 22, 1995 On March 16, 1995, McFadden & Miller, Inc. paid a 2% Engineering inspection fee of $3,390.00 to the City of Coppell. Later it was determined that the fee should not have been assessed by the Engineering Department but by the Building Inspection Department. The Engineering Department only assesses a 2% inspection fee for work performed in the City's right-of-way and/or easements. Since the proposed grading work will be performed on private property, Building Inspections should assess the inspection fee. Therefore, I am requesting that the 2% Engineering inspection fee in the amoum of $3,390.00 be refunded to: McFadden & Miller, Inc. 11350 Luna Road P.O. Box 59882 Dallas, Texas 75229 If you have any questions please contact me at 304-3679.