Park West CC(09)-LR 960605CONTRACT
INSPECTION
SERVICE
4305 Glenwood Ct. ~ranbury, TX 76049 (817) 246-8096
REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project: Park West Business Center II
Coppell, TX
Client: Reed Engineering Group
2424 Stutz, Suite 400
Dallas, TX 75235
Report No: 5367-6
Attention: Keith Atkins
Date of Service:
Page 1 of
06-05-96
Drawings utilized:
REPORT OF INSPECTION
Structural Drawings & Job Spec's
Locations/item inspected:
Deck inspection line 30 to line 24 between
grids A to D.
Discrepancies/comments:
I) Puddle welds through weld washers. Visual inspection revealed welds
comply to the contract documents.
II) TEK screw installation found to comply to the contract documents.
Clyde Fellers CWI~ 91020091
Technician
tract Inspection Service
This report is for the exclusive use of OUr client and shall not be modified or reproduced without writte~ approval from said clien=