Loading...
Park West CC(09)-LR 960605CONTRACT INSPECTION SERVICE 4305 Glenwood Ct. ~ranbury, TX 76049 (817) 246-8096 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: Park West Business Center II Coppell, TX Client: Reed Engineering Group 2424 Stutz, Suite 400 Dallas, TX 75235 Report No: 5367-6 Attention: Keith Atkins Date of Service: Page 1 of 06-05-96 Drawings utilized: REPORT OF INSPECTION Structural Drawings & Job Spec's Locations/item inspected: Deck inspection line 30 to line 24 between grids A to D. Discrepancies/comments: I) Puddle welds through weld washers. Visual inspection revealed welds comply to the contract documents. II) TEK screw installation found to comply to the contract documents. Clyde Fellers CWI~ 91020091 Technician tract Inspection Service This report is for the exclusive use of OUr client and shall not be modified or reproduced without writte~ approval from said clien=