Loading...
Peninsulas-CS 951110 ( P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 P.O. Box 478 Copl~ell, Texas 75019 November 10, 1995 Mr. Truman C. Edminster, P.E. Caner Burgess Engineering 7950 Elmbrook Drive, Suite 250 Dallas, Texas 75247-4951 RE: Peninsulas of Coppell Off-Site Sanitary Sewer Final Acceptance Dear Mr. Edminster: A final inspection of utilities for the referenced project has been confn-med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector cc: Ken M. Griffin, P.E., Asst. City Manager/City Engineer Howard Pafford, Utilities Superintendent Per Birdsall, Interim Street Superintendent Greg Jones, Chief Building Official Jeff Jones, Fire Marshal Doug Stevens, Engineering Technician DennisWinzler CO., INC. September 28, 1995 City of Coppell P.O. Box 4?8 Coppell, Texas 75019 Attn: Mr. Larry Davis Subject: Maintenance Bond Sanitary Sewer Improvements Along Macarthur Blvd. Dear Mr. Davis, Enclosed is the original two year fifty percent Maintenance Bond for the subject project, as requested. If you need additional information, please contact me. Sincerely, ~olley Fomykal ~ cc: Vista Properties, Inc. NO. KEALY AVE. LEWISVILLE, TEXAS 75057 (214) 436-4566 FAX (214) 219-0019 -== ~ r~ [ ~ First Community Insurance Company ~_~_~!....~ 2425 North Central Expressway. Suite 458. Richardson. Texas 750.80 214/480-0120 800,577-4077 l~onc] NO. 31-00370 MAINTENANCE 8OND KNOll; ALL BY THESE PRESENTS, That we, MURRAY CONSTRUCTION CO., INC. 515 NORTH KEALY AVE., LEWISVILLE. TEXAS 75057 as Principal. and FIRST ~ INSURANCE O21el~ , a corporation organized under the laws of the Stat~ of N~ Yot:k and duly authorized to do %ml,sss in th~ S~t~ of TEXAS . as Surety, are hsid ami firmly bound vato CITY OF COPPELL 255 PARKWAY BOULEVARD, P. O. BOX 478, COPPELL, TEXAS 75019 asObli~,intlmpaualsmnof FIFTY FIVE THOUSAND SIX HUNDRED NINETY NINE AND NO/100 ($ 55,699.00 ). to which payme~,t well and truly to be made w® do bind ourselves, our and each of our heirs, executors, administrators, sncc~sors and assigns jointly an~ s~ve~ally, firmly %y th~sa presents. WIiEREAS, the said Principal entered into a Coat, act witl~ VISTA PROPERTIES, INC. 5950 BERKSHIRE LN., #400, DALLAS, TX 75225 dated AuClust , 1995 SANITARY SEWER IMPROVEMENTS ALONG MACARTHUR BLVD. TO SERVE THE PENINSULAS OF COPPELL NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the Principal shall guaranto~ thnt the work will be free of any defective matorinis or workmanship which ~me apparent during the period of two ( 2 ) yemr(s) following compbtion of tho Contract than this obligation stroll be void, oth~wise to r~nain in full forc~ and effect, provided however, any additional warranty or guaraut~ wh~th~r expram.~ or implisd ~s ~ by th~ Principal or Manufacturer only, and tim Surety assmn~ no liability for such a gmrant~. sealed and datedthis f~"'--~ day of August ,19~ FIRST COMMUNITY INSURANCE COMPANY (w~o PAULINE L. LESCH At~riu'F~t PROPER ES, INC. 5950 Berkshire Lane Suite 400 Dallas, Texas 75225 (214) 360-1500 November 10, 1995 Mr. Larry Davis Construction Inspector City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Final Acceptance Letter for Off-Site Sanitary Sewer Line Improvements to serve the Peninsulas of Coppell, adjacent to the east side of MacArthur Blvd. Dear Mr. Davis: Enclosed is a $200 check to be held by the City of Coppell as a two year cash bond for maintenance for the Erosion Control work that was done along both sides of Denton Creek in conjunction with the above-referenced project. This cash bond is not for the work performed by Perry Builders, Inc. in the development of their on-site single family lots. For your information, I have instructed Carter & Burgess to place grass seed along both sides of the creek bank adjacent to the bridge. To clarify our conversation this morning, the previous check for $2,170 was to satisfy the two percent (2%) city inspection fee. If everything is acceptable, please forward a final acceptance letter for the project. If you have any questions, please do not hesitate to contact me at (214) 360-1526. I appreciate your efforts with this project. Sincerely, Dennis K. winzeler ' ' Vice President ' ' cc: Mr. Doug Stevens CITY OF COPPELL J.E. NO._?.~_~D_~ 3red by 0.4~ JOURNAL ENTRY ~,ed by POSTED BY: FUND: DATE= //-/V-¢~ DATE: OESCRIPTIO" ^CCOUNT OR. CR. NUMBER ']G~ ~- 'TP[ r.,.~~ o 19-oo.oo.0 '70? 0200.0o TOTAL