Park West CC(15.1)-LR 941021reed engineering GEOTECHNICAL CONSULTANTS October 21, 1994 Project No. 1920.2 Report No. 1 LoneStar Plywood and Door Corporation 600 N. Wildwood Irving, Texas ATTN: Mr. Danny McQuary Re: Construction Materials Testing LoneStar Plywood and Door Corporation Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of August 24 through October 14, 1994. During the referenced period, four samples of the natural subgrade and two samples of "select" fill were obtained and returned to the laboratory for development of optimum moisture-density relationships (Standard Proctor Curves). Test results are attached as Plates 1 through 6. During the period of August 29 through October 13, 1994, a total of 181 field density tests were taken on paving and building pad subgrade, natural fill, "select" fill and utility backfill. Test results are shown on Plates 7 through 12. Where tested, materials were.found to be in compliance with project specifications, except as noted. Where materials were not in compliance, the soils were reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. During the period of September 12 to 24, 1994, water pressure injection operations were observed. During this period, approximately 108,275 square feet of building pad was injected with two passes of water. Injections were performed to a depth of eight feet below present grade, and extended five feet beyond the building line. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAx)214/350-.0019 LoneStar Plywood and Door Corporation Project No. 1920.2/Report No. 1 October 21, 1994 Page 2 Upon completion of the second pass with water, the soil moisture was evaluated by drilling and sampling nine core borings. Borings were drilled on September 23 and 27, 1994. Continuous three-inch diameter samples were obtained to a depth of eight feet. All samples were evaluated for consistency by use of a pocket penetrometer. Pocket penetrometer test results are su~arized on Plate 13. Based on the test results and fill-time observation, additional injections with water were not considered necessary and the building pad was approved for recompaction and placement of "select" fill. Construction of piers was initiated on October 10, 1994. Pier construction was observed and the piers were found to be in compliance with project specifications. Pier designations and depths are shown on Plates 14 through 17. Pier designations provided on the pier log were shown on Sheet Nos. S-1 and S-2 of the project plans. Samples of the pier concrete were obtained on a daily basis. Compressive strength test results will be submitted under separate cover. Additional reports will be submitted as the work progresses. have any questions, do not hesitate to call. If you Sincerely, [NC. Ronald F. Reed, P.E. BES/RFR/msm copies submitted: (1) LoneStar Plywood & Door Corporation/ Mr. Danny McQuary (1) pross design group, inc./Mr. Mark Pross (1) Hill & Wilkenson/Mr. Dwayne Hodges (1) Hunt & Joiner, Inc./Mr. Vic Wit 105 103 = 101 99 ! \ / \. ! \ / \ / \ / ~ / \ / \ ! \ 17 19 21 23 25 Moisture Content (%) Standard Proctor Compaction Test No. 1 25 blows per each of 3 layers, with 5.5 pound hammer and 12 inch drop using Test performed on minus Boring No. -- Location Depth - Sample No. __ Classification 4 inch diameter mold #4 Sieve size material Lonestar P1 ywood Coppell, Texas Tan weathered limestone Liquid Limit % Maximum Unit Plastic *Limit O/o Dry Weight 104.2 pcf Plasticity Index Optimum Moisture Content 21.4 OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS , ,PLATE ] 1 103 101 99 97 95 93 17 19 21 23 25 Moisture Content (%) Standard and 12 inch drop using Test performed 'on minus Boring No. -- Location Proctor Compaction Test No. 2 25 blows per each of 3 layers, with 5.5 pound hammer 4 inch diameter mold #4 Sieve size material Lonestar Pl,ywood Coppell, Texas Depth - Sample No. __ Classification Brown cla,y Liquid Limit % Maximum Unit Plastic Limit % Dry Weight 100.9 pcf Plasticity Index Optimum Moisture Content 21.4 % OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS · PLATE 2 98 96 94 90 88 / \ 1 / \ ! \ I 23 25 27 29 31 Moisture Content (%) Standard Proctor Compaction Test No. 3 25 blows per each of 3 layers, with 5.5 pound hammer and 12 inch drop using 4 inch diameter mold Test performed 'on minus #4 Sieve size material Boring No. -- Location Lonestar Plywood Coppell, Texas Depth - Sample No. __ Classification Liqht brown clay Liquid Limit % Maximum Unit Plastic 'Limit % Dry Weight 97.3 pcf Plasticity Index Optimum Moisture COntent 26.7 % OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS PLATE 3 reed engineering 90 88 84 25 27 29 31 33 35 MoiaumComem (%) Standard Proctor Compaction Test No. 4 25, blows per each of 3 layers, with 5.5 pound hammer and 12 inch drop using 4 inch diameter mold Test performed 'on minus #4 Sieve size material Boring No. -- Location Lonestar PlywOod Coppell, Texas Depth - Sample No. __ Classification Tan and .cjra,y severly weathered shale Liquid Limit % Maximum Unit Plastic Limit % Dry Weight 90.0 Plasticity Index Optimum Moisture Content 2 9.4 OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS · PLATE 4 '~ 106 104 102 6 8 10 12 14 Moisture Content (%) Standard Proctor Compaction Test No. 5 25 blows per each of 3 layers, with5. 5 pound hammer and 12 inch drop using 4 inch diameter mold Test performed On minus #4 Si eve size material Boring No.- Location LoneStar Plywood and Door Corporation Depth. Sample No. __ Classification Coppell, Texas Reddish-brown sand with trace of clay Liquid Limit 17 Plastic Limit 13 Plasticity Index 4 Maximum Unit Dry Weight 105.8 Optimum Moisture Content 9.8 OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS 114 112 108 106 9 11 13 15 17 Moisture Content (%) and Test performed 'on minus Boring No. -- Location Standard Proctor Compaction Test No. 6 25~ blows per each of 3 layers, with S. 5 pound hammer 12inch drop using 4 inch diameter mold #4 Sieve size material LoneStar Plywood and Door Corporation Coppell, Texas Depth - Sample No. __ Classification Reddish-brown clayey sand Liquid Limit 24 % Maximum Unit. Plastic Limit 13 % Dry Weight 112.9 pcf Plasticity Index 11 Optimum Moisture Content 12.8 % OPTIMUM MOISTURE DENSITY CURVE , GEOTECHNICAL CONSULTANTS , PLATE 6 reed engineerin, g LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. i CORPORATION Date 08-29-94 08-30-94 08-31-94 Test No. Location Field DensityTests Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 1 180' S, 15' E (1) 2 40'S, 20'E (1) 3 20'S, 90'E(1) 4 90'S, 100'E(1) 5 160'S, 170'E (1) 6 180' S, 15' E (1) 7 40'S, 20'E(1) 8 20'S, 90'E (1) 9 90'S, 100'E(1) 10 160'S, 170'E(1) 11 200' S, 90'E(1) 12 250' S, ll0'E (1) 13 280' S, 100'E (1) 14 330'S, 120'E(1) 15 300' S, 200'E(1) 16 200'S, 230'E(1) 17 220'S, 200'E(1) 18 90'S, 240'E(1) 19 60'S, 210'E(1) 20 40'S, 20'E(1) 21 30'S, 80'E(1) 22 180'S, 70'E (1) 23 175' S, 20'E(1) 24 300'S, 290'E(1) 25 160'S, 285'E(1) 26 20'S,290'E(1) 27 50'S, 240'E(1) 28 190'S, 250'E(1) 29 40'S, 190'E(1) 30 180'S, 200'E 31 300'S,180'E 32 320'S,200'E 33 190'S, 145'E 34 190'S, l15'E 35 40'S,120'E 36 25'S,150'E 1.5 2.0 3.5 1.8 0.8 1.5 2.0 3.5 1.8 0.8 1.0 2.0 2 0 4 0 0 6 1 7 1 7 2 8 2.8 2.8 2.8 0.8 1.0 1.0 2.5 3.5 3.5 2.5 4.0 (1) 2.5 (1) 1.o (11) 1.0 (1) 0.9 (11) 0.9 (1) 1.5 (1) 1.5 96.0 89.7 89.0 91.3 97.9 92.5 96.8 94.8 94.0 92.7 99.3 101.0 89.5 90.0 93.6 90.8 95.3 97.6 93.4 98.2 98.3 93.3 94.4 95.9 101.1 91.7 92.8 94.4 98.4 96.7 95.2 93.1 97.2 98.8 94.7 94.7 Com- pac- Moisture tion Content Curve Level (%) N~, (%) 24.1 3 98.7a 18.2 2 88.9b 24.5 3 91.5c 21.9 3 93.8d 19.5 3 100.6e 27.0 3 95.1A 23.9 2 95.9B 26.3 3 97.4C 27.6 3 96.6D 27.7 3 95.3E 21.3 1 95.2 22.5 1 96.9 29.2 3 92.0 27.4 3 92.5 28.4 3 96.2 26.9 3 93.3 26.1 3 97.9 23.5 1 93.7 25.8 2 92.6 22.8 1 94.2 21.7 i 94.3 25.2 2 92.5 24.5 2 95.5 25.8 1 92.0 25.0 1 97.0 26.8 3 94.2 26.7 3 95.4 26.8 3 97.0 22.5 1 94.4 23.0 1 92.8 22.5 2 94.4 29.6 3 95.7 24.1 2 96.8 22.4 1 94.8 25.0 2 93.9 24.1 2 93.9 GEOTECHNICAL CONSULTANTS · PLATE r-,, reed engineering LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. 1 (Continued) CORPORATION Date 08-31-94 09-06-94 09-07-94 Test NO, 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Field Location 20'S, 80'E(1) 25'S, 85'E (1) 30'S, 10'E (1) 20'S, 15'E (1) 150' S, 65'E(1) 260'S, 30'E(1) 15o,s, lO,E (1) 90'S, 20'E(1) 20'S, 15'E (1) 100' S, 10'E(1) 150'S,325'E(1) 120' S, 250'E (1) 100' S, 150'E (1) 95'S, 20'E(1) 15'S,280'E(1) 120'S,275'E(1) 290'S,260'E(1) 340'S,290'E(1) 225' S, 150' E (1) 140' S, 155' E (1) 20'S, 150'E (1) 285'S, 220'E(1) 180'S, 225'E(1) 90' S, 210'E (1) 5'S,210'E(1) 5'S, 25'W(1) 20'N, 40'E (1) 15'S,150'E (1) 25'N, 330'E (1) 35'S,320'E(1) 90'S,285'E(1) 15'S, 295'E (1) 20'S,225'E(1) 10'S, 220'E(1) Density Tests Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 1.8 91.4 1.0 100.6 1.8 97.0 1.0 96.9 1.0 95.5 0 0 99.2 1 8 97.5 20 963 20 956 25 944 08 859 08 850 1 0 907 25 944 30 991 20 958 1 0 945 08 933 09 940 08 963 0 9 96.1 1 0 97.4 1.5 93.6 2.0 93.6 2.5 94.6 2.0 95.0 0.9 98.4 3.0 96.1 0.5 97.0 1.0 87.8 2.0 83.5 2.5 93.4 1.5 93.4 0.9 88.7 Com- pac- Moisture tion Content Curve Level (%) NO, (%) 28.7 3 93.9 24.5 I 96.5 26.1 1 93.1 24.8 i 93.0 27.5 3 98.2 23.6 2 95.2 25.1 2 96.6 22.7 2 95.4 22.4 2 94.7 21.9 2 93.6 29.9 4 95.4 29.9 4 94.4 26.7 3 93.2 26.4 3 97.0 24.8 1 95.2 21.3 2 94.9 23.4 2 93.7 22.2 2 92.5 25.8 2 93.2 25.5 2 95.4 25.3 2 95.2 21.5 2 96.5 23.6 2 92.8 24.2 2 92.8 24.9 2 93.7 25.9 2 94.2 22.4 1 97.6 25.9 2 95.3 22.8 2 96.1 31.1 4 97.5 33.8 4 92.8 23.8 2 97.6 22.3 2 92.6 30.5 4 98.5 PLATE 8 GEOTECHNICAL CONSULTANTS . · ~....., reed engineerin, g LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. 1 (Continued) CORPORATION Date 09-07-94 09-08-94 09-09-94 09-12-94 09-27-94 09-29-94 Test No. · 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 Field Location 90'S, 210'E(1) 180'S,220'E(1) 200'S, 290'E(1) 10'S, 295'E(1) 15'S,375'E(1) 15'S,320'E(1) 25'N, 300'E (1) 15'N, 180'E (1) 90'S,290'E(1) 15'S,285'E(1) 10'S,290'E(1) 20'S, 45'E(1) 8'S, 20'W(1) 30'N, 890'E(1) 5'N, 150'E (1) 10'N, 15'E (1) 10'S, 30'E (1) 5'N, 150'E (1) 50'N, 50'W(2) 50'N, 150'W(2) 10'N, 15'W (1) 75'S, 30'W(2) 200'S, 25'W(2) 255'S, 35'W(2) 225' S, 75'W(2) 110' S, 80'W(2) SO'S, 80'W(2) 100'S,100'E(1) 200'S, 100'E (1) 300'S, 100'E(1) 100'N, 180'E (3) 20'N, 40'W(4) 65'N, 20'W(4) 190'N, 70'W(4) 210'N, 120'W(4) Density Tests Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (pcf) (%) No, (%) 0.9 88.4 0.7 97.4 1.5 94.6 0.8 96.4 0.8 96 5 0.0 98 7 0.8 98 0 2.0 87 0 0.9 87 8 2.5 86 6 15 951 0 0 985 10 967 0 0 897 1 0 925 00 977 0 0 95.7 1 0 96.5 0 0 100.5 0 0 100.7 0 0 97.2 i 5 91.7 i 5 92.3 I 5 91.9 1.5 97.9 1.5 92.8 1.5 91.1 1.5 96.1 1.5 97.8 1.5 95.9 0.8 111.9 0.8 110.4 0.8 111.8 0.8 110.0 0.8 112.2 31.3 4 98.2 23.0 2 96.5 24.6 2 93.8 23.8 2 95.5 26.0 2 95.7 25.2 2 97.9 24.6 2 97.2 32.4 1 96.7 33.5 4 97.6 33.7 4 96.2 24.7 2 94.3 24.4 2 97.7 24.5 2 95.9 29.9 2 99.7 26.8 2 91.7g 19.3 2 96.8f 26.9 2 94.8 25.8 2 95.6G 23.7 2 99.6 24.9 2 99.8 25.3 2 26.3F 27.3 3 94.2 27.8 3 94.9 25.1 3 94.5 23.5 2 97.0 26.9 2 92.0 26.2 3 93.6 23.1 2 95.2 24.0 2 96.9 22.9 2 95.0 12.0 6 99.1 12.2 6 97.8 12.5 6 99.0 12.0 6 97.4 11.4 6 99.4 PLATE 9 GEOTECHNICAL CONSULTANTS , reed engineering LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. 1 (Continued) CORPORATION Date 09-29-94 09-30-94 10-01-94 Test No, 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 Field Location 100'N, 140'E (3) 80'N, 120'E (3) 40'N, 135'E (3) 30'N, 70'E(3) 60'N, 40'E(3) 210'N, 100'E (3) 200'N, ll0'E (3) 195'N, 125'E (3) ll0'N, 165'W (4) 130'N, 190'W (4) 220'N, 210'W (4) 230'N, 195'W(4) 210'N, 200'W(4) 60'S, 60'E(1) 120'S, 60'E(1) 180'S, 60'E(1) 240'S, 60'E(1) 300'S, 60'E(1) 340'S, 60'E (1) 340'S, 120'E (1) 300'S, 120'E(1) 240' S, 120'E (1) 180' S, 120' E (1) 120' S, 120' E (1) 60'S,120'E(1) 210'N, 200'W(4) 60'S, 40'W(1) 60'S, 40'W (2) I10'S, 40'W(2) 280'S, 120'W(2) 200' S, llS'W (2) 130' S, 120'W(2) 90' S, 125'W (2) 10' S, 125'W(2) 280'S, 15'W (2) Density Tests Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 1 5 99 2 1 5 91 2 1 5 100 6 1 5 105 0 1 5 101 8 1 5 94 7 1 5 100 2 1 5 100.7 0.8 110.8 0 8 111.6 0 8 112.4 0 8 111.7 0 8 110.5 0 8 106.5 0 8 109.6 0 8 108.6 0 8 108.5 0 8 106.9 0 8 107.3 0 8 106.3 0 8 105.9 0 8 106.5 0 8 109.1 0.8 110.1 0.8 104.8 0.8 110.5 0.0 107.2 0.0 103.9 0.0 101.4 0.0 108.7 0.0 108.3 0.0 109.7 0.0 110.9 0.0 109.6 0.0 109.7 Com- pac- Moisture tion Content Curve Level (%) NO, (%) 25.3 2 98.3 33.7 4 101.3 25.9 2 99.2 23.7 1 100.8 27.6 1 97.7 30.2 2 95.0 25.0 2 99.3 27.4 2 99.8' 11.3 6 98.1 11.1 6 98.8 12.0 6 99.6 12.0 6 98.9 12.4 6 97.9 11.8 5 100.7 9.0 6 97.1 12.5 6 96.2 15.0 6 96.1 10.1 5 101.0 10.2 6 95.0 12.8 5 100.5 13.1 5 100.1 11.9 5 100.7 9.9 6 96.6 10.8 6 97.5 9.7 5 99.1 12.4 6 97.9 10.9 6 95.0 10.7 6 92.0h 15.4 6 89.8 9.9 6 96.3 10.0 6 95.9 8.9 6 97.2 9.2 6 98.2 9.4 6 97.1 10.9 6 97.2 PLATE 10 G EOTEC HNICAL CO NSU LTANTS reed engineering LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. 1 (Continued) CORPORATION Date 09-29-94 10-01-94 10-04-94 10-07-94 10-11-94 10-12-94 Test No. 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 Field Location 200' S, 10'W(2) 160' S, 15'W (2) 90'S, 20'W(2) 15'S, 15'W(2) 60'S, 40'W(2) 110' S, 40'W(2) 70'S,200'W(2) 140'S, 200'W(2) 210'S, 200'W(2) 280'S,200'W(2) 330'S,200'W(2) 30'S, 270'W(2) 100' S, 270'W (2) 170' S, 270'W(2) 240'S, 270'W(2) 310'S, 270'W(2) 110' S, 40'W(2) 18o,s(5) 165'S(5) 160'S(5) 130'S(5) 200'S(5) 50'S(6) 100'S(6) 125'S (6) 450'S(5) 400'S(5) 450'S(5) 200'S(6) 205'S(6) 210'S (6) 215'S (6) Density Tests Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 0.0 109.7 0.0 112.2 0.0 110.9 0.0 109.3 0.0 108.4 0 0 110.3 0 0 104.8 0 0 111.1 0 0 107.3 0 0 108.1 0 0 110.7 0 0 108.1 0 0 109 5 0 0 110 5 0 0 104 3 0 0 102 6 0.0 112 0 3.0 93 5 2.0 93.5 1.0 95.5 0.0 92.9 4.0 92.7 2.0 93.5 1.0 95.7 0.0 93.1 2.0 93.2 1.0 94.2 0.0 93.4 2.5 91.0 1.8 90.8 1.0 93.0 0.2 93.3 Com- pac- Moisture tion Content Curve Level (%) NO, (%) 12.9 6 97.2 12.9 6 99.4 11.2 6 98.4 13.0 6 96.8 13.6 6 96.0H 8.2 5/6 97.7I 13.9 3/6 95.8 11.1 6 98.9 12.2 6 95.0 12.0 6 95.7 10.8 6 98.1 10.0 5/6 98.8 10.8 6 97.0 10.8 6 97.9 8.6 5 98.6 7.8 5 97.0 11.0 6 99.2 27.2 3 96.1 28.9 3 96.1 25.2 3 98.2 29.4 3 95.5 30.1 3 95.3 27.6 3 96.3 23.0 3 98.4 26.9 3 95.7 28.9 3 95.8 27.4 3 96.8 27.2 3 96.0 27.5 3/4 97.1 29.5 3/4 96.9 29.6 3 95.6 28.3 3 95.9 GEOTECHNICAL CONSULTANTS PLATE 11 reed engineering LONESTAR PLYWOOD AND DOOR CORPORATION COPPELL, TEXAS REPORT NO. 1 (Continued) Test Date No. 10-13-94 173 174 175 176 177 178 179 180 181 Field Density Tests Location Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (pcf) (%) NO, (%) 10'N, 20'E(7) 2.0 89.9 32.3 4 99.9 10'N, 20'E(7) 1.0 90.7 33.3 3/4 96.8 10'N, 20'E(7) 0.0 90.0 29.0 3/4 96.1 140' S, 50'E(7) 2.0 89.5 32.5 4 99.4 140' S, 50'E(7) 1.0 92.1 29.5 3/4 98.3 140'S, 50'E(7) 0.0 98.2 26.7 2 97.3 235'S, 50'E(7) 2.0 96.8 26.9 2 95.9 235'S, 50'E(7) 1.0 94.1 27.1 3 96.7 235'S, 50'E(7) 0.0 93.9 27.2 3 96.5 Footnotes: (1) (2) (3) (4) (5) (6) (7) Measurements referenced from NW corner of proposed building. Measurements referenced from NE corner of proposed building. Measurements referenced from SW corner of proposed building. Measurements referenced from SE corner of proposed building. Storm sewer east side of site, locations referenced from connection to 48" RCP. Storm sewer west side of site, locations referenced from connection to 48" RCP. 8" water line, locations referenced from proposed NE building corner. PLATE 12 GEOTECHNICAL CONSULTANTS reed engineering LONESTAR PLYWOOD AND DOOR CORPORATION COPPELL, TEXAS REPORT NO. I Depth (feet) SUMMARY OF POCKET PENETROMETER TESTS Boring No W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 0.0-1.5 1.2 3.4 1.8 2.2 2.8 1.7 2.7 3.0 1.5 1.5-3.0 2.0 1.3 1.6 1.4 2.1 2.7 2.5 1.8 2.0 3.0-4.5 1.0 1.4 2.3 1.4 2.5 1.4 2.5 1.8 1.5 4.5-6.0 1.6 1.7 2.0 1.8 1.3 1.9 2.5 2.8 2.7 6.0-7.0 1.5 1.6 1.5 1.9 1.6 2.0 2.5 3.5 2.5 7.0-8.0 2.0 1.6 1.7 2.0 1.8 2.3 3.2 2.8 2.0 GEOTECHNICAL CONSULTANTS , PLATE 13 reed engineerin, g LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT NO. i CORPORATION Date 10-10-94 10-11-94 Pier No, G.9-8.9 G.5-8.9 G.1-8.9 F.6-8.9 E 9-9 E 1-9 D 4-9 C 8-9 C 1-9 B 4-9 A.7-9 A-9 A-8.4 A-7.8 A-7.4 A-6.9 A-6.4 A-5.8 A-5.3 A-4.7 A-4.2 G.8-8.8 G.8-8.65 G.8-8.2 G.8-8 G.5-8.2 G.1-8.2 G.3-8.8 F.7-8.8 E.9-8.8 F.3-8.6 F.5-8.35 E.1-8.5 D.4-8.5 C.8-8.5 C.1-8.5 B.4-8.5 Pier Summary Depth Final Pier Bell Before Pier Diameter Size Bell Depth (in.) (in.} (ft,) (ft.) 24 48 12.3 24 48 11.9 24 48 11.9 24 48 11.9 24 52 12.0 24 60 11.9 24 60 12.3 24 60 20.5 24 60 11.5 24 60 11.8 24 60 12.2 24 56 12.0 24 60 12.6 24 52 12.0 24 48 12.0 24 48 11.5 24 52 11.7 24 48 11.6 24 48 11.5 24 48 12.0 24 48 12.0 18 36 12.7 18 36 13.5 18 36 13.6 18 36 13.3 18 36 13.2 18 36 13.2 18 36 13.8 18 36 13.2 18 36 12.8 18 36 13.4 18 36 13.1 20 48 13.1 20 48 13.3 20 48 13.5 20 48 13.2 20 48 12.6 12.3 11 9 11 9 12 0 12 0 12 0 12 3 20.5 11.5 11.8 12.2 12.0 12.6 12.0 12.0 11.5 11.7 11.6 12.0 11.8 11.8 12.9 13.5 13.6 13.4 13.1 13.3 13.8 13.2 12.5 13.6 13.1 12.8 13.3 13.5 13.4 13.0 GEOTECHNICAL CONSULTANTS - PLATE 14 reed engineering LONESTAR PLYWOOD AND DOOR COPPELL, TEXAS REPORT'NO. 1 (Continued) CORPORATION Date 10-12-94 P~er Summary Pier Bell Pier Diameter Size No. (in.) (in, Depth Before Bell (ft,) Final Pier Depth (ft.) A. 7-8 . 5 20 48 13.1 13.9 A.7-8 20 48 13.3 14.2 B.4-8 20 48 13.3 · 13.7 C.1-8 20 48 13.1 13.1 C.8-8 20 44 12.5 12.6 D-8 20 40 12.7 12.7 D.4-8 20 44 12.7 12.7 E.1-8 20 48 13.2 13.3 E.9-8 20 44 13.0 13.3 F.6-8 20 40 12.6 12.6 G.1-8 20 40 13.1 13.3 G.5-8 20 40 13.0 13.0 G-7 20 44 13.0 13.0 E-7 20 44 12.6 12.9 D-7 20 44 13.2 13.2 C-7 20 44 13.3 13.5 B-7 20 44 13.2 13.2 G-6 20 44 12.8 12.9 F-6 20 44 12.9 13.1 E-6 20 44 13.0 13.0 D-6 20 44 13.1 13.0 C-6 20 44 13.1 13.3 B-6 20 44 12.9 13.4 G-5 20 44 13.0 13.0 F-5 20 44 12.7' 12.7 E-5 20 44 12.8 12.9 D-5 20 44 12.7 12.7 C-5 20 44 12.6 13.0 B-5 20 44 13.0 13.4 B-4 20 44 12.5 12.8 C-4 20 44 12.7 12.7 D-4 20 44 12.9 12.9 E-4 20 44 13.4 13.4 F-4 20 44 13.8 13.9 G-4 20 44 13.8 14.0 GEOTECHNICAL CONSULTANTS , PLATE 15 reed en.g!neering LONESTAR PLYWOOD AND DOOR CORPORATION COPPELL, TEXAS REPORT NO. 1 (Continued) Date 10-12-94 10-13-94 10-14-94 Pier Summary Pier NO, Depth Final Pier Bell Before Pier Diameter Size Bell Depth (in,) (in.) (ft,) (ft.) G-3 20 44 13.3 13.3 F-3 20 44 13.8 14.0 E-3 20 44 13.3 13.4 D-3 20 44 13~3 13.8 C-3 20 44 13.3 13.9 B-3 20 44 13.3 13.3 B-2 20 44 12.7 12.9 C-2 20 44 13.0 13.4 D-2 20 44 13.0 13.1 E-2 20 44 13.0 13.2 F-2 20 44 13.5 13.6 G-2 20 44 13.3 13.3 F.1-8.36 18 36 12.6 12.7 F.1-8.55 18 36 12.6 12.6 E.95-8.55 18 36 13.0 13.0 E.9-8.5 20 44 12.9 13.0 H-1 24 52 12.3 12.3 G-1.5 24 52 12.0 12.0 F-1.2 24 52 12.7 12.7 E-1.7 24 52 12.9 13.0 E-i.1 24 52 13.0 13.0 D-1.5 24 52 13.0 13.3 C-1.9 24 52 12.8 13.0 C-1.3 24 52 13.2 13.4 B-1.2 24 52 13.0 13.0 A-1.5 24 52 13.1 13.1 G.9-8.7 24 48 12.4 12.5 G.9-8.3 24 48 12.5 12.6 H-8 24 48 12.9 12.9 H-7.3 24 48 12.9 12.9 H-6.8 24 48 13.2 13.2 H-6.3 24 48 12.5 12.5 H-5.8 24 48 12.6 12.6 H-5.2 24 48 12.8 12.8 B-1.7 24 52 13.2 13.5 H-4.6 24 48 12.8 12.8 GEOTECHNICAL CONSULTANTS , PLATE 16 reed engineering LONESTAR PLYWOOD AND DOOR CORPORATION COPPELL, TEXAS REPORT NO. 1 (Continued) Date 10-14-94 Pier Summary Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No, (in,) (in,) (ft,) (ft.) H-4.1 24 52 13.1 13.0 H-3.5 24 48 12.9 12.9 H-2.9 24 52 12.8 13.0 H-2.3 24 52 12.9 12.9 H-1.7 24 52 13.1 13.1 PLATE 17 GEOTECHNICAL CONSULTANTS ·