Loading...
Park West CC(15)-LR 941006REPORT OF IN-PLACE DENSITY TESTS 4747 In, iq ~le~r~ Suite Dallas, Texas 75247 Client: Project: Premiss Properties Limited, Inc. Wrangler Road Trench Line Coppell, Texas Date: Project No. Report No. Client No. 10/6/94 43-1341-94 941478 71765000 Laboratory Test Method: ^STM D-698 M/D No. 1 2 3 Material Description Orange and tan shaly clay Dark tan clay with some limestone Dark brown clay with some limestone Moisture % 22.5 25.0 23.0 Density Requirement (PCF) Moisture Density 98.0 -3/+4 95% 94.5 -3/+4 95% 97.5 -3/+4 95% Field Test Method: ^STM D-2922 / D-3017 Test No. 17 18 19 2O 21 22 23 24 FIELD DENSITY TEST Test Location Sta 7+00, surface test Sta 7+00, 2' below grade Sta 7+00, 4' below grade Sta 7+00, 6' below grade Sta 8+00, surface test Sta 8+00, 2' below grade Sta 8+00, 4' below grade Sta 8+00, 6' below grade MID NO. Moisture % Dry Density Density (PCF) % 2 27.6 90.1 95.3 2 25.9 91.0 96.3 2 28.3 91.3 96.6 2 30.1 90.6 95.9 2 28.8 89.7 94.9 2 28.9 90.6 95.9 2 27.6 91.5 96.8 2 26.5 92.6 98.0 Complies except where noted (*). Technician: D. Taylor Time: Report Distribution: (1) Prentiss Properties Limited, Inc. (1) TH Dal Excavation (1) City of Coppell HBC ENGINEERING, INC. E. Eugene Harbour Vice-Presidem 302AK This report is exclusively for the use of the client indicated above and shall eot be reproduced except in full without the written approval of HBC Engineering. Inc.