Loading...
Park West CC(15)-LR 940929REPORT OF CONCRETE COMPRESSIVE STRENGTH Date of Service: 9/29/94 Report No. Client No. Project No. Client: Prcntiss Properties Limited, Inc. Project: 1717 Main Street, Suite 5000 Dallas, Texas 75201 Attn: Mr. Donald L. Mills, Constr. Mgr. 941394 43-1341-94 Wrangler Road Trench Line Coppell, Texas Services: Observe concrete for proper slump and mix number. Cast concrete compression tests. CONTRACTOR: Tri-Dal CONCRETE SUPPLIER: Redi-Mix PLANT: 1 SPECIFICATION REQUIREMENTS: STRENGTH: 4000 psi ~28 days SLUMP: 2" AIR: N/A TEST METHOD: AST1V[ C-39 ASTM C- 143 PROJECT DATA CONCRETE CLASS: 4000 psi PLACEMENT DATE: 9/29/94 TIME SAMPLED: 2:30 p.m. TEMPERATURE (F) - AIR 94° TRUCK NO: 148 tUR CONTENT (%): N/A PLACEMENT LOCATION: Manhole at station 0+00, bottom wall, sanitary sewer. BY: J. Love CONCRETE: 89° T~CKET NO: 130930 UNIT WEIGHT (pcf): N/A CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 0.25 1 2 0.25 1 3 0.25 1 4 0.25 DATE TESTED REPORT OF TESTS MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (Days) (lbs. force) (psi) TYPE 10/06/94 10/06/94 10/27/94 10/27/94 7 130,820 4,630 7 131,010 4,630 Average 7 days 4630 28 28 Average 28 days Technician: J. Love Report Distribution: (1) Prentiss Properties Limited, Inc. (1) City of Coppell (1) Tri-Dal Excavation Started: 1:30 p.m. Stopped: 3:00 p.m. ~ Engineering, Inc. E. Eugene Harbour Vice President 301AK This report is exclusively for the use of the client indicated above and shall not be reproduced except in furl without the written approval of HBC Engineering, Inc. REPORT OF CONCRETE COMPRESSIVE STRENGTH 4747 ~ DMIm, Texas 75247 Date of Service: 9/29/94 Report No. Client No. Project No. Client: Prentiss Properties Limited, Inc. Project: 1717 Main Street, Suite 5000 Dallas, Texas 75201 Attn: Mr. Donald L. Mills, Constr. Mgr. 941394 43-1341-94 Wrangler Road Trench Line Coppell, Texas Services: Observe concrete for proper slump and mix number. Cast concrete compression tests. CONTRACTOR: Tri-Dal CONCRETE SUPPLIER: Redi-Mix pL.q*r: 1 SPECIFICATION REQUIREMENTS: STRENGm: 4000 psi ~28 days SLUMP: 2" AIR: N/A TEST METHOD: ASTM C-39 ASTM C-143 PROJECT DATA CONCRETE CLASS: 4000 psi PLACEMENT DATE: 9/29/94 T~ME SAMPLED: 2:30 p.m. TEMPERATURE (F) - AIR 94° T~UCK NO: 148 AIR CONTENT (%): N/A PLACEMENT LOCATION: Manhole at station 0+00, bottom wall, sanitary sewer. BY: J. Love CONCRETE: 89° TICKET NO: 130930 UNIT WEIGHT (PO0: N/A CYLINDER MARKED SET NO. MEASURED SLUMP 1 1 0.25 1 2 0.25 1 3 0.25 1 4 0.25 REPORT OF TESTS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (Days) (lbs. force) (psi) 10/06/94 7 130,820 4,630 10/06/94 7 131,010 4,630 Average 7 days 4630 10/27/94 28 163,080 5,770 10/27/94 28 161,220 5,700 Average 28 days 5740 FRA~URE TYPE Technician: J. Love Report Distribution: (1) Prentiss Properties Limited, Inc. (1) City of Coppel~ (1) TrkDal Excavation StartS: 1:30 p.m. Stopped: 3:00 p.m. IBC Englneenij. g, Inc. Vice President 301 AK This report Is exclusively fo~ the use of the client indicated above and shall not be reproduced except in full without the wriUen approval of HBC Engkmering, Inc.