Loading...
Peninsulas-CS 950306Carter- -Burgess Consultants in Engineering, Architecture, Planning and the Environment March 6, 1995 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Reference: MacArthur Park Dear Ken: Based upon a verbal agreement between Michael Martin (City of Coppell) and Tim House (Developer's representative) it was agreed that this letter, rather than a complete Traffic Control Plan, will suffice for the excavation portion of MacArthur Park. During the excavation process for each tract of MacArthur Park, there will be a very minimal amount of vehicular traffic crossing MacArthur Boulevard to get to each site. Flagmen will be used for any vehicular traffic crossing MacArthur Boulevard and for any construction equipment hauling debris away from the site. In addition, two signs will be provided as traffic approaches the site from each direction on MacArthur Boulevard. The first sign will read "Construction Ahead", and the second sign will read "Trucks Entering Street". If you have any questions, please call our office. Sincerely, CARTER & BURGESS, INC. Terry w. litchell, P.E. Associate Principal TVVM/dmy 94332301.L02 Carter & Burgess, Inc. 7950 Elmbrook Suite 250 Dallas, Texas 75247-4951 (214) 638-0145 Metro (214) 263-2019 Fax (214) 638-0447