Loading...
Peninsulas-CS 950630June 30, 1995 Mr. J. David Rhodes Carter & Burgess 7950 Elmbrook Drive Suite 250 Dallas, Texas 75247-4951 RE: Third Review of Landscape Comments for Peninsulas of Coppell Dear Mr. Rhodes: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. The city will need a letter of notification from the Denton County Levy District allowing the construction of the trail and needed maintenance for the trail before the plans are approved and the project receives a final acceptance. Contact Rick Wieland at 304-3553 for any questions. 2. Show the existing guard rail on east and west side of MacArthur Blvd. 3. On the east side of MacArthur connect the sidewalk to the existing sidewalk at the bridge. 4. Adjust all existing valves and relocate existing fire hydrant. Also, adjust and relocate the meters on the west side of MacArthur Blvd. 5. The existing sidewalk on the west side of MacArthur may need to be reconstructed. 6. On sheet C-3 of the Trail Plan, check with Rick Wieland at 304-3545 concerning the location of the hike and bike trail at the bridge on the east side of MacArthur Blvd. There are various other minor comments throughout the plans. Once these comments have been addressed, the revised set of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please contact me at 304-3682. Sincerely, Atul Patel, E.I.T. Graduate Engineer