Loading...
Park West CC(17)-LR001027 F~--;.E Z~ , I~:1-11~ I I-I1~: I~:l=llnc~ GEOTECHNICALAND ~ I~ I~ I I I~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Parkwest Commerce Center - Building 3 Enterprise Drive at Wrangler Drive Coppell, Texas REPORTED TO: Pritchard Associates REPORT NO. 46 2501 State Street REG PROJECT NO. 4771 Dallas, Texas 75201 SAMPLE DATE: 10-27-00 ATTN: Ms. Ashley Parkinson TECHNICIAN: M. Silva CONTRACTOR: McFadden & Miller, Inc. Location of Sample Set Number I Location I Quantity Represented I Floor slab Leaveout: 5'S, 50'E of N.W. building corner 10/40 2 Paving: 300'S, 10'E of N.E. building corner 10/50 Design Information Set No. I Source of Concrete I Mix Identification I Specified Strength p.s.i. 1 TXI 47 4000 2 TXI 8273 4000 Test Results so, i c~,,n~,rI Age@ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 1120 11-03-00 7 116460 4120 1120 11-24-00 28 151980 5380 1120 11-24-00 28 150940 5340 5360 1120 Hold H 2 1121 11-03-00 7 95660 3390 1121 11-24-00 28 132250 4680 1121 11-24-00 28 124470 4410 4550 1121 Hold H Cylinder Data Set I Cylinder I Timeof I Air I Concrete I Air I Ticket No. ID Slump Sample Temp. Temp. Entrainment Number 1 1120 5.00 6:53AM 65 78 N/A 2769708 2 1121 5.50 9:00AM 70 79 N/A 27699114 · Distribution: (1) Pritchard Associates/ Submitted by: Ms. Ashley Parkinson (1) O'Brien & Associates/ REED ENGINEERING GROUP, INC. Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Keith E. Atkins (1) Halff Associates/Mr. Dave Littleton KENje (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Parkwest Commerce Center - Building 3 '" Enterprise Drive at Wrangler Drive Coppell, Texas REPORTED TO: Pritchard Associates REPORT NO. 46 2501 State Street REG PROJECT NO. 4771 Dallas, Texas 75201 SAMPLE DATE: 10-27-00 ATTN: Ms. Ashley Parkinson TECHNICIAN: M. Silva CONTRACTOR: McFadden & Miller, Inc. Location of Sample Set Number I Location I Quantity Represented I Floor slab Leaveout: 5'S, 50'E of N.W. building corner 10/40 2 Paving: 300'S, 10'E of N.E. building corner 10/50 Design Information Set No. I Source of Concrete I Mix Identification I Specified Strength p.s.i. 1 TXI 47 4000 2 TXI 8273 4000 Test Results No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 1120 11-03-00 7 116460 4120 1120 11-24-00 28 1120 11-24-00 28 1120 Hold H 2 1121 11-03-00 7 95660 3390 1121 11-24-00 28 1121 11-24-00 28 1121 Hold H Cylinder Data Set I Cylinder Timeof I Air [ Concrete Air I Ticket No. ID Slump Sample Temp. Temp. Entrainment Number 1 1120 5.00 6:53AM 65 78 N/A 2769708 2 1121 5.50 9:00AM 70 79 N/A 27699114 Distribution: (1) Pritchard Associates/ Submitted by: Ms. Ashley Parkinson (1) O'Brien & Associates/ REED ENGINEERING GROUP, INC. Mr. Mick Granlund (1) Technistructures/Mr. Keith Leslie Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Keith E. Atkins (1) Halff Associates/Mr. Dave Littleton KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone I 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019