Loading...
Peninsulas-CS 950816 COPPELL PUBLIC WORKS MEMORANDUM DATE: August 16, 1995 TO: Larry Davis, Const. Inspector FROM: Howard Pafford, Utilities Superintendent RE: Final Water/Sewer Walk Through for Peninsu_.as of Coppell A walk-thru was conducted on the above referenced project and the following items were found to be deficient. 1. Ail manholes need to be checked after off-site sewer line is installed. (Line in subdivision has water in it over inverts). 2. Ail 4-2" blowoffs need close nipples and elbows. 3. Lot 18 needs sweep Tee on lot clean out replaced. 4. Lot 23 no water to service. 5. Lot 20 and 21 needs concrete pads repoured around lot cleanouts. 6. Lot 7 needs white sewer pipe replaced with green SDR 35 sewer pipe in clean out. 7. Manhole at east Peninsulas Drive and MacArthur needs external chimney seal,install or repour manhole with the proper neck to allow chimney seal to fit on inside. Can call Chilton & associates of Dallas for assistance in installing bridge for internal chimney seal. HLP/dg