Park West CC(17)-LR001026 TSIT 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: October 26, 2000 Report of Built- Up Roof Inspection PROIECT: Park West ~ Phase II Coppdl, TX GENERAL CONTRACTOR: McFadden Miller, Inc. CONTACT: Iimmie Laxen 214-808-4953 ROOFING CONTRACTOR: HEC 4815 Grema - Dallas, Tx 75356 ROOFING FORE~: Robert Morris 214-638-5970 MANU~FACTORER: ]'ohns Manville - Type 1TI Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Pt. Cloudy AMBIENT TEMPERATURES: 71 to 80 FORECAST FOR NEXT DAY: Slight chance of rain - rain on weekend SIZE OF CREW 14 TIME: NA ROOFING MATERIALS RECEIVED? No LABELS ATTACHED? Yes MATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No SPECIFIED TEMPERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F. Kettle: 11:30 am - 500 EVT: 11:45 - 475 DECK INSPECTED? Yes CRICKETS INSTALLED? No Location: NA AREA OF ROOF APPLICATION: Southeast roof section Number of SQ's (SF X 100) placed this date: approximately 100 SQ Was placement per specifications: Yes OPERATIONS INSPECTED: Inspection this date at the above referenced project revealed Insulation application was as required. One layer staggered, mechanically attached fesco ( 8 fasteners per 4' X 8' area) Felt application had begun and was of good quality. Applied in a lapping fashion, uniform and dean application. No fishmouths~ voids or dry, laps noted. Flashing detail around slq,'lights and parapet wall was on-going. Minor ponding was noted in front of the scuppers on the southeast corner, the first, second and third scuppers on the east v~at[, south to north. Technician: 1. Halverson/Williams Time: 4 hours Chad McEntee