Loading...
Peninsulas-CS 950815 COPPELL ENGINEERING MEMORANDUM DATE: August 15, 1995 ~ TO: Larry Davis, Construction Inspector FROM: Rey Gonzales, Street Superintendent RE: Peninsulas of Coppell - Walk Through August 15, 1995 The following is a list of deficiencies found during our recent walk through of this project. Please ensure that the contractor receives a copy of the punch list items. WEST SIDE: * Rout and seal curb crack 7 joints west of drop inlets on the south side of the street * Rout and seal crack from drop inlet to manhole; include joint all the way across street * Rout and seal crack 5 joints east of drop inlet on south side * Patch curb 8 joints east of the drop inlet * Check all redwood headers for iow seal and saw joints EAST SIDE: * Bent Tree - rout and seal crack at intersection * Storm sewer behind Bent Tree Court needs to be looked at for possible extension to creek and RCP cleaned out/Developer needs to provide written document of intent * Check all outfalls to creek for possible extension/ additional rip-rap/clean RCP * Ail brick paver installations MUST be completed prior to final acceptance Thank you for your cooperation in this matter. If you have any questions, please feel free to contact me. /rg WALKTHRU.R(~