Loading...
Park West CC(17)-LR001019 TSIT 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: October 19, 2000 Report of Built- Up Roof Inspection PROJECT: Park West 12II Phase lli Coppell, TX GENERAL CONTRACTOR: McFadden Miller, Inc. CONTACT: ~immie Laxen 214-808-4953 ROOFEqG CONTRACTOR: HEC 4815 Gretna - Dallas, Tx 75356 ROOFDqG FOREMAN: Robert Morris 214-638-5970 M/kNLReACTORER: ~'ohns Manville - T,vpe ITI Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Pt. Cloudy AM. BIEN~F TEMPERATURES: 61 to 84 FORECAST FOR NEXT DAY: Slight chance of rain - rain on weekend SIZE OF CREW 10 TIME: NA ROOFING MATERIALS RECEIVED? No LABELS .ATTACHED? Yes MATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No SPECII:~D TEMPERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application)' 450 +25 degrees F. Kettle: 10:30 am- 500 EVT: NA DECK INSPECTED? Yes CRICKETS INSTALLED? No Location: NA AREA OF ROOF APPLICATION: Form expansion joint to north wall Number of SQ's (SF X 100) placed this date: approximately 100 SQ Was placement per specifications: Yes OPEIC&TIONS INSPECTED: Inspection this date at the above referenced project revealed Insulation application was as required. One layer staggered, mechanically attached fesco ( 8 fasteners per 4' X 8' area) Felt application had begun and was of good quality. Applied in a lapping fashion, uniform and clean application. No fishmouths, voids or dry laps noted. Technician: J. Halverson/Williams Time: 4 hours Chad McEntee