Park West CC(17)-LR001017 TS1T
2502 Gravel Drive - Ft. Worth, TX 76118
817-589-9933
Date: October 17, 2000
Report of Built- Up Roof Inspection
PROJECT: Park West ITl Phase II
Coppell, TX
GENERAL CONTRACTOR: McFadden Miller, Inc.
CONTACT: limmie Laxen 214-808-4953
ROOFING CONTRACTOR: HEC
4815 Grema - Dallas, Tx 75356
ROOFD~G FOREMAN: Robert Morris 214-638-5970
MANR.rFACTORER: Johns Manville - Type III Asphalt - 4 ply with aggregate ballast
Technical Information
WEATHER CONDITIONS: Sunny AMBIENT TEM. PERATURES: 65 to 78
FORECAST FOR NEXT DAY: Same
SIZE OF CREW 10 TIME: NA
ROOFING M. ATERLALS RECEIVED? No LABELS ATTACHED? Yes
MATERIALS STORED AS REQUIRED? Yes MATERI. ALS REJECTED? No
SPECIFITD TEMPERATURES: (Asphalt)
Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F.
Kettle: 11:15 am- 500 EVT: 11:45 am-450
DECK INSPECWED? Yes
.... cRICKETS INSTALLED? Yes Location: .North east wall between-drains - iow area --
AREA OF ROOF APPLICATION: Northeast corner wall - to north expansion joint
Number of SQ's (SF X 100) placed this date: approximately 80 SQ
Was placement per specifications: Yes
OPERATIONS INSPECTED: Inspection this date at the above referenced project revealed
Application along the east wall, a low area no sloped, as is the remainder of the deck was
cricketed to the drains. Insulation application was as required. One layer staggered,
mechanically attached fesco ( 8 fasteners per 4' X 8' area) Felt application had not begun
The area of application included 7 skylights and 4 drain areas.
Advised GC that the panel lift bolts needed to be fdled with grout, prior to roo£mg.
Technician: I. Halverson/W'illiams Time: 4 hours
Chad McEntee