Park West CC(17)-LR001012 CONTRA CT INSPECTION SER VICE, Inc.
4305 Gienwood Ct. Granbury, TX 76049 (81'/) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL ERECTION INSPECTION
Project: Parkwest Commerce Center Report No: 19219-0
Coppell, Texas Attention: Keith Atldns
Client: Reed Engineering Group Date of Service: 10-12-00
2424 Stutz, Suite 400
Dallas, Texas 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings utilized: Contract Documents
Locations/item inspected: As noted
Discrepancies/comments:
I) Metal roof deck grid lines A-F, column line 1-8.
1) Puddle welds comply for size,, fusion, and pattern.
2) Side lap screws comply for installation and pattern.
II) Roof framing grid lines C-D, column lines 14-15.
1) Bearing and welds of joist comply.
2) Bearing and welds of girders comply.
*3) Joist bridging not complete.
*Open item
Cecil R McKinney, CWI #99121311 ~/(Q~/~ 2~
Technician Contract Inspection Service
This repor~ is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client