Loading...
Park West CC(17)-LR001012 CONTRA CT INSPECTION SER VICE, Inc. 4305 Gienwood Ct. Granbury, TX 76049 (81'/) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL ERECTION INSPECTION Project: Parkwest Commerce Center Report No: 19219-0 Coppell, Texas Attention: Keith Atldns Client: Reed Engineering Group Date of Service: 10-12-00 2424 Stutz, Suite 400 Dallas, Texas 75235 Page 1 of 1 REPORT OF INSPECTION Drawings utilized: Contract Documents Locations/item inspected: As noted Discrepancies/comments: I) Metal roof deck grid lines A-F, column line 1-8. 1) Puddle welds comply for size,, fusion, and pattern. 2) Side lap screws comply for installation and pattern. II) Roof framing grid lines C-D, column lines 14-15. 1) Bearing and welds of joist comply. 2) Bearing and welds of girders comply. *3) Joist bridging not complete. *Open item Cecil R McKinney, CWI #99121311 ~/(Q~/~ 2~ Technician Contract Inspection Service This repor~ is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client