Peninsulas-CS 950928 COPPF~L UTILI?IRS H~HORANDUM DATE: September 28, 1995 TO: Larry Davis, Construction Inspector FROM: Howard Pafford, Utilities Superintendent RE: Final Water/Sewer Walk Through for Peninsulas of Coppell A final walk thru was conducted on September 28, on the above referenced project. The following items were found to be deficient. 1. Manhole at east Peninsulas Drive and MacArthur needs external chimney seal, install or repour manhole with the proper neck to allow chimney seal to fit on inside. Can call chilton & associates of Dallas for assistance in installing bridge for internal chimney seal. 2. Lot 32 meter can busted. 3. Lot 32 dirt and concrete in bottom of manhole 4004. 4. Manhole 4001 on west Peninsulas Drive. Dirt in the bottom of invert and no chimney seal. 5. Manhole at 4002 needs dirt cleaned out of bottom. HLP/dg