COPPELL PUBLIC WORKS
MEMORRNDUM
DATE= AUgUst 16, 1995
TO: Larry Davis, Const. Inspector
FROM: Howard Pafford, Utilities Superintenden
RE: Final Water/Sewer Walk Through for Peninsu.as
of Coppell
A walk-thru was conducted on the above referenced project and the
following items were found to be deficient.
1. All manholes need to be checked after off-site sewer line is
installed. (Line in subdivision has water in it over
inverts).
2. All 4-2" blowoffs need close nipples and elbows.
3. Lot 18 needs sweep Tee on lot clean out replaced.
4. Lot 23 no water to service.
5. Lot 20 and 21 needs concrete pads repoured around lot
cleanouts.
6. Lot 7 needs white sewer pipe replaced with green SDR 35
sewer pipe in clean out.
7. Manhole at east Peninsulas Drive and MacArthur needs
external chimney seal,install or repour manhole with the
proper neck to allow chimney seal to fit on inside. Can
call Chilton & associates of Dallas for assistance in
installing bridge for internal chimney seal.
HLP/dg
Co./Dept. Co.
OOPPET,T, ; Phone # Phone #
' Fax# a I? ..CO/,~ Fax#
MEMORA
Post-it' Fax Note 7671 Date I q~'~pages l
DATE: August 15, 1995
Phone
Post-it' Fax Note 7671 Date
RS: August Peninsulasl5, ofl995Coppell - W To
Co.~ept. Co.
The following is a list of deficien Phone, Pho~
walk through of this project. Plea F,x~ ~$-3-3';m F~,
receives a copy of the punch list i
~7~7
WEST SIDE:
* Rout and seal curb crack 7 joints west of drop inlets on the
south side of the street
* Rout and seal crack from drop inlet to manhole; include
joint all the way across street
* Rout and seal crack 5 joints east of drop inlet on south
side
* Patch curb 8 joints east of the drop inlet
* Check all redwood headers for low seal and saw joints
EAST SIDE:
* Bent Tree - rout and seal crack at intersection
* Storm sewer behind Bent Tree Court needs to be looked at for
possible extension to creek and RCP cleaned out/Developer
needs to provide written document of intent
* Check all outfalls to creek for possible extension/
additional rip-rap/clean RCP
* All brick paver installations MUST be completed prior to
final acceptance
Thank you for your cooperation in this matter. If you have any
questions, please feel free to contact me.
/rg