Loading...
Peninsulas-CS 951005 (2) ENGINEERING DIVISION MEMORANDUM DATE: October 5, 1995 %\/ %\\/ TO: %~/ Larry Davis, Construction Inspector \\/~ FROM: Howard Pafford, Utilities Superintende~}~/ RE: Off Site Sewer Line for Peninsulas of Co~'p~ll~ A walk thru was conducted on October 5, 1995, for the above referenced project. The following items were found to be deficient. 1. Need steel straps installed on crossing. 2. Erosion protection on creek banks needs to be installed. (ie, rip-rap or wire tied crush stone). If you have any questions, please give me a call. HLP/dg