Peninsulas-CS 951016 Coppell, Texas 75019
October 16, 1995
Mr. Dennis Winzeler
Vista Properties, Inc.
5950 Berkshire Lane, Suite 400
Dallas, Texas 75225
RE: Temporary Release
Peninsulas of Coppell Off-Site Sanitary Sewer, Adjacem to east side of MacArthur Blvd.
Dear Mr. Winzeler:
A temporary letter of release is being provided for the construction of the off-site sanitary sewer
adjacent to the east side of MacArthur Blvd.
The utility constmction/maimenance bonds have been received; however, at this time: 1) the
construction inspection fee; and 2) the Erosion Control/Maintenance Bonds have not been
forwarded to the City of Coppell Engineering Division. Upon receipt of these items, a final
acceptance letter will be issued by this office.
Please provide the construction inspection fee and the Erosion Control/Maintenance Bonds as
soon as possible. If you have any questions please feel free to call be at (214) 304-6384.
Sincerer,
Con§traction Inspector
cc: Kenneth M. Griffin, P.E., Asst. City Manager/City Engineer
Howard Pafford, Utilities Superintendent
Greg Jones, Chief Building Official
Doug Stevens, Engineering Technician
Murray Construction
file/ldavis/0finalac.ltr