Park West CC(17)-LR000804 GEOTECHNICALAND J G J~J I'--I I I F~
ENVIRONHENTAL CONSULTANTS J
CONCRETE CYLINDER TEST REPORT
Parkwest Commerce Center - Building 3
Enterprise Drive at Wrangler Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company REPORT NO. 23
3811 Turtle Creek Blvd., Suite 730 REG PROJECT NO. 4771
Dallas, Texas 75219 SAMPLE DATE: 08-04-00
ATTN: Mr. Richard Crow TECHNICIAN: C. Theriot
CONTRACTOR: McFadden & Miller, Inc.
Location of Sample ~'"
Set Number I Location I Quantity Represented
1 Floor Slab: 100'N, 40'E of S,W. building corner 140/400
2 Floor Slab: 50'S, 10'E of NW Bldg. corner 240/400
Design Information
FSource of Concrete I Mix Identification I Specified Strength p,s.i.
TXI 0047^ 4000
Test Results
II I i i i
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8354 08-11-00 7 126580 4480
8354 09-01-00 28
8354 09-01-00 28
2 8355 08-11-00 7 12600 4460
8355 09-01-00 28
8355 09-01-00 28
Cylinder Data
No. ID Slump Air Temp. Temp. Entrainment Sample Number
1 8354 4.50 5:00AM 78 83 N/A 2700528
2 8355 5.0' 6:15AM 80 87 N/A 2700627
Distribution: (4) Myers & Crow Company/ Submitted by:
Mr. Richard Crow
(1) Pritchard°Associates/
Mr. Jim Prit~hard REED ENGINEERING GROUP, INC.
(1) O'Brien & Associates/
Mr. Mick Granlund Original Signed By
(1) Technistructures/Mr. Keith Leslie
(1) McFadden & Miller/ Keith E. Atkins
Mr. Jon Jacobson KEA/je
(1) Halff Associates/Mr. Dave Littleton
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR.., SUITE 400 · DALLAS, TX 75235., TEL [214] 350 5600 · FAX [214] 350 0019