Loading...
Peninsulas-LR 950918 ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. suite lOO COMPRESSION TEST Dallas, Texas 75229 (214) 620-8911 TESTEDFOR: PERRY HOMES, INC. DATE OF ISSUE: SEPTEMBER 18, 1995 HOUSTON, TEXAS PROJECT: MACARTHUR PARK OUR REPORT NO.: 94526- 43 COPPEL, TEXAS FIELD DATA PIERS, AT STATION 14+10 AND STATION 14+46 LOCATION OF CONCRETE PLACEMENT OF AERIAL CROSSING DATE PLACED 0 9 / 11 / 9 5 PLANT 2 2 TIME 14: 4 5 DELIVER TICKET NO 3 7 3 4 9 3 SLUMP (ASTM C-143) 5 MIX PROPORTIONS (SSD) N/A AIR CONTENT (ASTM C-231 I-I OR C-173 [] ) N/A CEMENT N/A AIR TEMPERATURE 81 WATER N / A CONCRETE TEMPERATURE 9 0 FINE AGGREGATE N / A DATE RECEIVED 0 9 / 12 / 9 5 COARSE AGGREGATE N / A FIELD DATA SUBMITTED BY PM ADMIXTURE N / A MIX DATA SUBMI'I=rEO BY S¥~ SPECIMENS CAPPED IN ACCORDANCE WITH A C-1231 [] REMARKS COMPRESSION TEST RESULTS ~Cylinders made by ALPHA (NOMINA!.~ CYLINDER SIZE 6" )~ !2") (ASTM C-39) representative. [] Cylinders made by Architect's LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative. NO. CURING TESTED DAYS LOAD STRENGTH, PSI [~ylinders picked Lip by ALPHA laboratory. 80 LAB 09/18/95 7 132,980 28.27 4,700 [] Cylinders delivered to ALPHA laboratory. 81 LAB 10/09/95 28 138,950 28.27 4,920 [~.'"Co'o'o~mCompression test resuits comply with 82 LAB 10/09/95 28 142,850 28.27 5,050 applicable specifications. [] Compression test results do not comply with applicable specifications. 83 LAB HOLD H 28 . 27 Specifications 2 8 4,0 0 0 ~ D~~V 1 ~ER NG, ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. Suite 100 COMPRESSION TEST Dallas, Texas 75229 (214) 620-8911 TESTEDFOR: PERRY HOMES, INC. DATE OF ISSUE: SEPTEMBER 18, 1995 HOUSTON, TEXAS PROJECT: MACARTHUR PARK OUR REPORT NO.: 94526-43 COPPEL, TEXAS FIELD DATA PIERS, AT STATION 14+10 AND STATION 14+46 LOCATION OF CONCRETE PLACEMENT OF AERIAL CROSSING DATE PLACED 0 9 / 11 / 9 5 PLANT 2 2 TIME 1 4: 4 5 DELIVER TICKET NO 3 7 3 4 9 SLUMP (ASTM C-143) 5 MIX PROPORTIONS (SSD) N/A AIR CONTENT (ASTM C-231 [] OR C-173 [] ) N/A CEMENT N/A AIR TEMPERATURE 8 1 WATER N / A CONCRETE TEMPERATURE 9 0 FINE AGGREGATE N / A DATE RECEIVED 0 9 / 1 2 / 9 5 COARSE AGGREGATE N / A FIELD DATA SUBMI'I=rED BY PM ADMIXTURE N / A MIX DATA SUBMITTED BY S~l~ (~-~('~OR SPECIMENS CAPPED IN ACCORDANCE WITH A C-1231 [] REMARKS COMPRESSION TEST RESULTS [;~Cylinders made by ALPHA (NOMINAL CYENDER SIZE 6" X 12") (ASTM C-39) representative. [] Cylinders made by Architect's LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative. NO. CURING TESTED DAYS LOAD STRENGTH, PSI [~'Cylinders picked up by ALPHA laboratory. 80 LAB 09/18/95 ? 132,980 28.2? 4,700 [] Cylinders delivered to ALPHA laboratory. 81 LAB 10/09/95 28 28.27 [] Compression test results comply with applicable specifications. 82 LAB 10/09/95 28 28.2? [] Compression test results do not comply 83 LAB HOLD H 28.27 with applicable specifications. Specifications 2 8 4/ 0 0 0 Fl~_.~ffully Submitted ~a~PHK TESTING, INC, DAVID P. STETTNER ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 REPORT OF FIELD Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR: PERRY HOMES DATE: 09/18/95 HOUSTON, TEXAS McARTHUR PARK 94526-48 PROJECT: OUR REPORT NO. COPPELL, TEXAS TEST DATA: TEST ~ELEV. SOILID OPTIMUM MAXIMUM~B INP~CE INP~CE PERCENT NO. DATEDEPTH~,~,~ MOISTURE DRYDENSI~ MOISTURE DRYDENSI~ COMPAC~ON COMMENT NUMBER % PCF % PCF 73 09/i8 FG-3 i 20.0 102.0 20.6 97 95 i-A 74 09/18 FG-2 1 20.0 102.0 21.2 98 96 1-A 75 09/18 FG-1 1 20.0 102.0 19.7 98 97 1-A 76 09/18 FG 1 20.0 102.0 20.4 98 96 1-A TEST LOCATION: 73 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION i5+90 74 lO" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION i5+95 75 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION 16+00 76 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION 16+05 1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Res~-,eS~ffullv Submitted. / 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS " .......