Peninsulas-LR 950918 ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wisconsin St.
suite lOO COMPRESSION TEST
Dallas, Texas 75229
(214) 620-8911
TESTEDFOR: PERRY HOMES, INC. DATE OF ISSUE: SEPTEMBER 18, 1995
HOUSTON, TEXAS
PROJECT: MACARTHUR PARK OUR REPORT NO.: 94526- 43
COPPEL, TEXAS
FIELD DATA
PIERS, AT STATION 14+10 AND STATION 14+46
LOCATION OF CONCRETE PLACEMENT
OF AERIAL CROSSING
DATE PLACED 0 9 / 11 / 9 5 PLANT 2 2
TIME 14: 4 5 DELIVER TICKET NO 3 7 3 4 9 3
SLUMP (ASTM C-143) 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT (ASTM C-231 I-I OR C-173 [] ) N/A CEMENT N/A
AIR TEMPERATURE 81 WATER N / A
CONCRETE TEMPERATURE 9 0 FINE AGGREGATE N / A
DATE RECEIVED 0 9 / 12 / 9 5 COARSE AGGREGATE N / A
FIELD DATA SUBMITTED BY PM ADMIXTURE N / A
MIX DATA SUBMI'I=rEO BY S¥~
SPECIMENS CAPPED IN ACCORDANCE WITH A C-1231 []
REMARKS
COMPRESSION
TEST
RESULTS
~Cylinders made by ALPHA
(NOMINA!.~ CYLINDER SIZE 6" )~ !2")
(ASTM C-39) representative.
[] Cylinders made by Architect's
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative.
NO. CURING TESTED DAYS LOAD STRENGTH, PSI [~ylinders
picked
Lip
by
ALPHA
laboratory.
80 LAB 09/18/95 7 132,980 28.27 4,700 [] Cylinders delivered to ALPHA
laboratory.
81 LAB 10/09/95 28 138,950 28.27 4,920 [~.'"Co'o'o~mCompression test resuits comply with
82 LAB 10/09/95 28 142,850 28.27 5,050 applicable specifications.
[] Compression test results do not comply
with applicable specifications.
83 LAB HOLD H 28 . 27
Specifications 2 8 4,0 0 0 ~
D~~V 1 ~ER NG,
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wisconsin St.
Suite 100 COMPRESSION TEST
Dallas, Texas 75229
(214) 620-8911
TESTEDFOR: PERRY HOMES, INC. DATE OF ISSUE: SEPTEMBER 18, 1995
HOUSTON, TEXAS
PROJECT: MACARTHUR PARK OUR REPORT NO.: 94526-43
COPPEL, TEXAS
FIELD DATA
PIERS, AT STATION 14+10 AND STATION 14+46
LOCATION OF CONCRETE PLACEMENT
OF AERIAL CROSSING
DATE PLACED 0 9 / 11 / 9 5 PLANT 2 2
TIME 1 4: 4 5 DELIVER TICKET NO 3 7 3 4 9
SLUMP (ASTM C-143) 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT (ASTM C-231 [] OR C-173 [] ) N/A CEMENT N/A
AIR TEMPERATURE 8 1 WATER N / A
CONCRETE TEMPERATURE 9 0 FINE AGGREGATE N / A
DATE RECEIVED 0 9 / 1 2 / 9 5 COARSE AGGREGATE N / A
FIELD DATA SUBMI'I=rED BY PM ADMIXTURE N / A
MIX DATA SUBMITTED BY S~l~ (~-~('~OR
SPECIMENS CAPPED IN ACCORDANCE WITH A C-1231 []
REMARKS
COMPRESSION
TEST
RESULTS
[;~Cylinders made by ALPHA
(NOMINAL CYENDER SIZE 6" X 12")
(ASTM C-39) representative.
[] Cylinders made by Architect's
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE or Contractor's representative.
NO. CURING TESTED DAYS LOAD STRENGTH, PSI [~'Cylinders
picked
up
by
ALPHA
laboratory.
80 LAB 09/18/95 ? 132,980 28.2? 4,700
[] Cylinders delivered to ALPHA
laboratory.
81 LAB 10/09/95 28 28.27 [] Compression test results comply with
applicable specifications.
82 LAB 10/09/95 28 28.2?
[] Compression test results do not comply
83 LAB HOLD H 28.27 with applicable specifications.
Specifications 2 8 4/ 0 0 0 Fl~_.~ffully Submitted
~a~PHK TESTING, INC,
DAVID P. STETTNER
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100 REPORT OF FIELD
Dallas, Texas 75229 COMPACTION TESTS
(214) 620-8911
TESTED FOR: PERRY HOMES DATE: 09/18/95
HOUSTON, TEXAS
McARTHUR PARK 94526-48
PROJECT: OUR REPORT NO.
COPPELL, TEXAS
TEST DATA:
TEST ~ELEV. SOILID OPTIMUM MAXIMUM~B INP~CE INP~CE PERCENT
NO. DATEDEPTH~,~,~ MOISTURE DRYDENSI~ MOISTURE DRYDENSI~ COMPAC~ON COMMENT
NUMBER % PCF % PCF
73 09/i8 FG-3 i 20.0 102.0 20.6 97 95 i-A
74 09/18 FG-2 1 20.0 102.0 21.2 98 96 1-A
75 09/18 FG-1 1 20.0 102.0 19.7 98 97 1-A
76 09/18 FG 1 20.0 102.0 20.4 98 96 1-A
TEST LOCATION:
73 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION i5+90
74 lO" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION i5+95
75 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION 16+00
76 10" GRAVITY LINE EAST OF MACARTUR BLVD. @ STATION 16+05
1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Res~-,eS~ffullv Submitted. /
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS " .......