Peninsulas-LR 950912 ALPHA TESTING, INC.
2209 Wisconsin St,, Suite 100
Dallas, Texas 75229 DAILY FIELD REPORT
(214) 620-8911
TESTED FOR PERRY HOHES INC. DATE 09/12/95
HOUSTON, TEXAS
PROJECT McARTHUR PARK OUR REPORT NO. 94526--45
COPPELL, TEXAS
WEATHER: CLOUDY DATE:
TEMPERATURE RANGE: 70 TO: 75
ALPHA Repre~e~talive: P. M.
THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE, TO PERFORM CONCRETE TESTING.
THE TECHNICIAN DID NOT CAST ANY SETS OF TEST CYLINDERS FROM CONCRETE
SCHEDULED TO BE PLACED FOR ABUTMENTS AT AERIAL CROSSING.
TESTING WAS CANCELLED BECAUSE CONCRETE HAD BEEN PLACED THE PREVIOUS DAY.
THE TECHNICIAN RETURNED TO THE LABORATORY.