Loading...
Peninsulas-LR 950911 ALPHA TESTING, IN_. 2209 Wisconsin St., Suite 100 REPORT OF FIELD Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR: PERRY HOMES DATE: 09/11/95 HOUSTON, TEXAS McARTHUR PARK 94526-47 PROJECT: COPPELL, TEXAS OUR REPORT NO. TEST DATA: TEST ~.~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* DEPTH ~ NUMBER % PCF % PCF 70 09/11 FG-3 I 20.0 102.0 20.5 98 96 1-A 71 09/11 FG-2 1 20.0 102.0 21.0 99 97 1-A 72 09/11 FG-1 1 20.0 102.0 21.5 99 98 1-A TEST LOCATION: 70 10" GRAVITY LINE EAST OF MACARTUR BLVD. 0 STATION 13+10 71 lO" GRAVITY LINE EAST OF MACARTUR BLVD. 0 STATION 13+20 72 10" GRAVITY LINE EAST OF MACARTUR BLVD. ~ STATION 13+30 1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS RespeClfully Submitted, // /--~ 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS / ALPHA TESTING,~JNC.// ~/ ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 DALLY FIELD REPORT (214) 620-8911 TESTED FOR DATE PERRY HOMES INC. 09/11/95 HOUSTON, TEXAS ~OJECT OUR REPORT NO. McARTHUR PARK 94526-46 COPPELL, TEXAS WEATHER: CLOUDY DATE: TEMPERATURE RANGE: 85 TO: 90 ALPHA Reprelenlltive: D . S . THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO PERFORM CONCRETE TESTING. THE TECHNICIAN DID NOT CAST ANY SETS OF TEST CYLINDERS FROM CONCRETE SCHEDULED TO 8E PLACED FOR AERIAL UTILITY CROSSING. TESTING WAS CANCELLED BECAUSE OF CONCRETE AVAILABILITY DAN SMITH RESCHEDULED THE TECHNICIAN FOR ilAM THE FOLLOWING DAY. THE TECHNICIAN RETURNED TO THE LABORATORY.