Loading...
Peninsulas-LR 950908 ALPHA TESTING, IN~. 2209 Wisconsin St., Suite 100 REPORT OF FIELD Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR: PERRY HOMES DATE: 09/08/95 HOUSTON, TEXAS McARTHUR PARK 94524>-41 PROJECT: COPPELL, TEXAS OUR REPORT NO. TEST DATA: TEST ~ ELEV. SOII ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOISTURE% DRY PcFDENSITY MOISTURE% DRY PcFDENSITY COMPACTION COMMENT* 54 09/08 :G-3 3 25.0 92.5 26,. 8 89 96 1-A 55 09/08 ~G-2 3 25.0 92.5 27 ~3 88 95 1-A 56 09/08 =G 3 25.0 92.5 27.6 89 96 1-A 57 09/08 FG-3 3 25.0 92.5 27.9 89 96 1-A 58 09/08 FG-1 3 25.0 92.5 28.0 88 95 1-A 59 09/08 FG 3 25.0 92.5 26.5 89 97 1-A TEST LOCATION: 64 10" GRAVITY LINE EAST OF MACARTUR BLVD. 0 STATION 11+00 65 lO" GRAVITY LINE EAST OF MACARTUR BLVD. 0 STATION 11+10 66 10" GRAVITY LINE EAST OF MACARTUR BLVD. O STATION 11+20 67 10" GRAVITY LINE EAST OF MACARTUR BLVD. O STATION 14+05 68 lO" GRAVITY LINE EAST OF MACARTUR BLVD. 8 STATION i4+iO 69 10" GRAVITY LINE EAST OF MACARTUR BLVD. ~ STATION 14+20 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS . 4. CEMENTTREATED D. RETEST ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 DALLY FIELD REPORT (214) 620-8911 TESTED FOR PERRY HOMES INC. DATE 09/08/95 HOUSTON, TEXAS PROJECT McARTHUR PARK OUR REPORT NO. 94526--42 COPPELL, TEXAS WEATHER: CLEAR DATE: TEMPERATURE RANGE: 75 TO: 80 ALPHA Repre~efttative: THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO MONITOR PIER EXCAVATIONS. TWO PIERS WERE DRILLED AND PLACED WITH CONCRETE. THE TECHNICIAN CAST ONE 5ET OF FOUR CONCRETE TEST CYLINDERS FROM THE PLACEMENT. RESULTS OF PIER MONITORING ARE SHOWN ON THE ENCLOSED REPORTS. CONCRETE COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. ALL REQUESTED FIELD TESTS WERE PERFORMED AND TEST RESULTS WERE REPORTED TO LEONARD AUTRY, THE HARRISON, WALKER, & HARPER REPRESENTATIVE. TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING. ALPHA TESTING, IN~ . 2209 Wisconsin St., Suite 100 Tex,, 75229 REPORT OF PIER INSPECTION TESTEO FOR: DATE: 0 Perry Homes Houston, Texas O~R REPORTNO.: 94526-42A ARCHITECT: Carter & Burgess PROJECT: McArthur Park GENERAL CONTRACTOR: Murray Coppel 1, Texas PIER CONTRACTOR: Foundation Dri 11 ers CONCRETE ~JffffLIER: Pioneer PIER INFORMATION: Arial Crossing P~rDeeign..on St.a. ].4+10 St.a. 14+46 Date Dri,le. 09/08 09/08 Date Concr.e Pmced 09/08 09/0 Sba. D,.m~er- D~gn / Actu,,i, inch. 36" / 36" 36" / 36" / / Ground Surface Elevation 440.0 438.0 Top eieve, on- D,,si;. / Actuei, fl 440.0 / 440.0 440.0 / 440.0 / / Bo.om ElevaUo. - D.~g. / Actu.~, fl 424.0 ! 42]** 5 422.0 / 418.0 / / Deviation from Design - Bottom Elevation (fl +) ~). 5 4.0 Steel Reinforcement Used: verfic~ (No. & .~ze) 13#$' S 13#@' S T~. (No. & epacing) Sp, c. (No. & roc,,t~on) N/A ~/A Length o~ c,--ing u~d. fl N/A N/A Depth to Bearing Strata, fl ~/A ~/A Penetration of Pier into Bearing Strata, fl Total Pier Length, fl 18.5 20.0 REMARKS R~mitted