Peninsulas-LR 950626 ALPHA TESTING, INC. REPORT OF CONCRETE
.,.,.. 2209 w,scons, s, COMPRESSION TEST
' .,', .)' Suite 100
· .,.',.,..,-;'//
.-'.'..- Dallas. Texas 75229
-, 1214) 620-8911
PERRY HOMES, INC. DATE'JUNE 26,1995
HOUSTON, TEXAS
P~oJ~¢~ PIACARTHUR PARK OUR REPORT NO. 94526-35
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAV I NC, E. BOUND ON W. PEN I NSULA DR.
STATION 5+75
DATE PLACED 06/26/95 PLANT 6
TIME 05.' 18 DELIVER TICKET NO 6018655
SLUMP 2 · 5 MIX PROPORTIONS (SSD) 4000
AIR CONTENT 4 · 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DM ADMIXTURE N/A
MIX DATA SUBMCI-fED 8Y LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6- X 12"l ~Cyhnders made by ALPHA
representatBve.
~ Lab Customer ; Type Dire ~ Coml~M~ve L..-~-- Cylinders made by Architect's
No . No. i
or
Contractor's
representative.
~Cylinders p~cked up by ALPHA
.68 !94526 'LAB 07/03/95 7 4030 laboratory.
169 :94526 LAB 07/24/95 28 [] Cylinders delivered to ALPHA
~ i laboratory.
170 94526 LAB 07/24/95 28 ~ Compression test results comply w,th
applicable specificahons.
:,7. 1 94526 LAB HOLD H ~ Compress~on test results do no~ comply
wdh applicable speclficahons
TYPE OF FRACTURE. IF Crt'HER
THAN CONICAL
DAY I D P. STETTNER
tfully Submitted
TESTING· INC
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St COMPRESSIONTEST
Suite 100
Dallas. Texas 75229
(214) 620-8911
PERRY HONES, INC. DATE JUNE 26,1995
HOUSTON, TEXAS
P,OJECT MACARTHUR PARK OUR REPORT NO. 94526--34
COPPELL, TEXAS
FIE LD DATA
,,.OCATION OF CONCRETE PLACEMENT PAVING,E. BOUND ON W. PENINSULA DR.
STATION 2+25
DAT~ PLAC~O 06/26/95 PLANT 3
03: 50 DELIVER TICKET NO. 3013894
TIME
SLUMP 2.5 MIX PROPORTIONS (SSD) 4000
AlE CONTENT 4 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DM ADMIXTURE N/A
MIX DATA SUBMI'I-I'ED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SiZE 6" X 12"1 ?:/~Cyhnders made by ALPHA
representabve
Lab CullOmlr TyN Date Aee Ceml~m~ve ,_ji Cylinders made by Architect's
No. No. Cu~.m~ Te~ted Days S~e~th. Psi or Contractor's representative.
164 !94526 LAB 07/03/95 7 3560 ~'"~linders picked up by ALPHA
i laboratory.
:65 :94526 LAB 07/24/95 28 ~-~ Cylinders delivered to ALPHA
labo~alory
i 6 :94526 LAB 07/24/95 28 L_I Compression test results comply w~th
! applicable specifications.
:67 94526 LAB ! HOLD H ~ Compress~on test results do nol comply
~ w~th applicable specifications.
:s~.~,.~ .... , 28 4000
TYPE OF FRACTURE, IF OTHER
A~/[.3~_.STI NG. INC
ALPHA TESTING, INC. REPORT OF CONCRETE
22o9 w,soo.s,n st COMPRESSION TEST
.,...,,....?/~ Su.te
· .,'.. Dallas. Texas 75229
· "' (214) 620-8911
i'F.C'.Ti.D~:OR PERRY HOLIES, INC. Date JUNE 26,1995
HOUSTON, TEXAS
PROJ[CT MACARTHUR PARK OUR RE~'ORT NO. 94526--33
COPPELL, TEXAS
FIE LD DATA
LC(_-A'rlONOFCON(~RETEPLACEMENT PAVING, 25' S AND 10'E OF CENTER LINE OF
W. PENINSULA DR. CUL-DE-SAC
DA'rF ,~_ACED 06/26/95 PLANT 7
T,~E 12:50 DELIVER TICKET NO. 7011341
SLUMP 2 MIX PROPORTIONS (SSD) 4000
AIR CONTENT 5 CEMENT N/A
AIR me MPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DP! ADMIXTURE N/A
MIX DATA SUBMIT-I'ED BY LATT I liORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12"l ~-'~'~ylinders made by ALPHA
representabve
Lab Customer Tyl3e Date ~ Coml3~'m~ve ~: Cylinders made by Architect's
No. No. Cur~n~ Te~te~l Day1 St~e~h. Pli or Contractor's representative
! ~ Cyhnders p~cked up by ALPHA
-60 I;94526 LAB 07/03/95 7 3360 laboratory.
~,61 94526 LAB 07/24/95 28 L~ Cylinders del,vere<l to ALPHA
i laborato~.
!62 '94526 'LAB 07/24/95 28 ~ Compression test results comply w,th
applicable specifications.
;63 94526 LAB ' HOLD H .~ Compression tesl results do r~Dl comply
; w,th applicable spec,licat~ons
:s~ ...... ~,.~, 28 4000
TYPE OF FRACTURE. IF OTHER
THAN CONIC, AL
DAV ID P. STETTNER
~R~pict fully
.~_.~'A TESTING. INC
ALPHA TESTING, INC. REPORT OF CONCRETE
.-". 2 o9 W,soons,n St COMPRESSION TEST
Dallas· Texas 75229
(2141620-8911
PERRY HOHES. INC. DATE JUNE 26,1995
HOUSTON, TEXAS
~.o~c~ HACARTHUR PARK OUR ~EPO,T NO. 94526-32
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRE¥£ PLACEMENT PAVING, 20' W, 10'N OF CENTER LINE OF
W, PENINSULA DR, CUL-DE-SAC
DATE PLACED 06/26/95 PLANT 6
'r~ME 11: 00 DELIVER TICKET NO. 6018655
SLUMP 2. 5 MIX PROPORTIONS (SSD) 4000
AIR CONTENT 4 , 5 CEMENT N/A
AIR TEMPERATURE 85 WATER N/A
CONCRETE TEMPERATURE 85 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DM ADMIXTURE N/A
MIX DATA SUBMITTED aY LATT I PIORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SiZE 6" X 12") L~_ Cyl,nders made by ALPHA
representabve
Lab Cu~tome* Type Dete 2~e Comp~we ,~. Cyhnders made by Architect's
No. No. Curl~ T~II:~ DIVa ~ Stren~h, P=i or Contractor's representahve.
' ,~"~ylinders p~cked up by ALPHA
56 94526 LAB 07/03/95 7 4940 laboratory
: 57 ' 94526 L A B 07 / 24 / 95 28 i ~_~ CylinderS delivered to ALPHA
laboratory.
! 58 ' 94526 LAB 07/24/95 28 ~ ~J Compression test results comply wdh
; ~ applicable specifications.
i59 .94526 LAB HOLD H
.'.__'. Compress4on test results do n(X comply
w~tl't applicable specfficahons.
TYPE OF FRACTURE. IF OTHER
THAN CONICAL
DAV I D P. STETTNER
PHA tfully Submitted
TESTING. INC
ALPHA TESTING, INC. REPORT UF CONCRETE
· -..-.2209 w,sco.s,n s, COMPRESSION TEST
Suite 100
.,...:.' Dallas. Texas 75229
(214~ 620-8911
TESTED FOR PERRY HOMES, INC. DATE JUNE 26,1995
HOUSTON, TEXAS
PROJECT HACARTHUR PARK OUR REPORT NO. 94526-31
COPPELL, TEXAS
FIELD DATA
~OCAT~ON OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR.
STATION 5+80
DATE PLACED 06/26/95 PLANT 7
TiME 03:30 DELIVER TICKET NO 7011282
SLUMP 2.5 MIX PROPORTIONS (SSD) 3000
AIR CONTENT 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/24/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DM ADMIXTURE N/A
MIX DATA SUBMI'I-TED aY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE ~," X 12"1 ,~..~""'Cyhnders made by ALPHA
representahve
Lab Customer Type DIt® ~ Compr~ive ~_~ Cylinders made by Architect's
N<~. No. Curm; Te~ted Dmym S~reneth, P~ or Contractor's representative
52 94526 LAB 06/30/95 7 ' 3050 .'~_'~yhnders p,cked up by ALPHA
laboratory.
53 94526 LAB 07/21/95 28 [.~ Cylinders dehvered to ALPHA
laboratory
54 94526 LAB 07/21/95 28 .~ Compression test results comply w,th
apphcable specifmcat~ons.
55 94526 LAB HOLD H =
; :.'".~ Compres,.~on test results do nol comply
wfth apphcabte specmficabons
!sp.~.,.~. ~ 28 3000
TYPE OF FRACTURE, IF OTHER
THAN CONICAL
DAV I D P. STETTNER
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 W,scons,n St COMPRESSION'TEST
Suite 100
Dallas. Texas 75229
'/ (214) 620-8911
T.~ST;._D~:OR PERRY HOHES, INC. DATE JUNE 26,1995
HOUSTON, TEXAS
PROJECT HACARTHUR PARK OUR REPORT NO. 94526-34
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONC:RETE PLACEMENT PAVlNG,E. BOUND ON W. PENINSULA DR.
STATION 2+25
DATE PLACED 06/26/95 PLANT 3
TIME 03: 50 DELIVER TICKET NO. 3013894
SLUMP 2. 5 MIX PROPORTIONS (SSDI 4000
AIR CONTENT 4 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DM ADMIXTURE N/A
MIX DATA SUBMITTED BY LATT I PIORE
COMPRESSION TEST RESULTS REMARKS
(NOMINAL CYLINDER SIZE S" X 12"l ~_-"~ylinders made by ALPHA
representative.
!
Lab. Customer Type Dltl DiJk~yI ComFlll~vl ~. Cylinders made by Archd~t's
~ No. No. Curi~ T~ S~h. Psi or ~ntra~or's representahve.
,64 ~94526 LAB 07/03/95 7 3560 ~linders picked'up by ALPHA
; laborato~.
:65 ~94526 LAB 07/24/95 28 4300 ~ ~hnde~ detiver~ to ALPHA
I la~rato~.
',66 94526 'LAB 07/24/95 28 4540 mpre~ion te~ re{ults comply with
i I I applicable s~ificahons.
~=67 .94526 ~LAB HOLD H
{ ~ ~ ~ ~mpre~on te~ resul~ ~ n~ ~mply
~ j I I with applicable s~ificahons.
~s~.~:,,~,.~, 28 4000
TYPE OF FRA~URE, IF ~HER
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St COMPRESSIONTEST
Suite 100
Dallas. Texas 75229
"'; .... (214) 620-8911
II
PERRY HOMES, INC. DATE JUNE 26,1995
HOUSTON, TEXAS
..oJ~c~ MACARTHUR PARK OUR REPORT NO. 94526--33
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRIETE PLACEMENT PAVING, 25' S AND 10'E OF CENTER LINE OF
W. PENINSULA DR. CUL-DE-SAC
DATE PLACED 06/26/95 PLANT 7
TIME 12: 50 DELIVER TICKET NO. 7011341
SLUMP 2 MIX PROPORTIONS (SSD) 4000
AlE CONTENT 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A
DATE RECEWED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DH ADMIXTURE N/A
MIX DATA SUBMI'I-rED BY LATT I HORE
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12") ~ylinders made by ALPHA
represenlat~ve.
I
Lab Cultomar TyI~ ! Dale ~ Coml~e~wl ,--J Cylinders made by Architect's
No. No. Curing
~ or Contractor's representative.
,__ Cylinders picked up Dy ALPHA
:60 '94526 LAB i 07/03/95 7 3360
laboratory.
:61 .94526 LAB 07/24/95 28 4110 [] Cylinders delivered to ALPHA
laboratory.
!62 '94526 LAB 07/24/95 28 4100 repression test results comply with
: i applicable specifications.
i63 194526 LAB HOLD H [3 Cornpress~on test results do no~ comply
i i with applicable specdlcatlons
Jspec:~ ,ca'.,er~sJ
98 4000
TYPE OF FRACTURE. IF OTHER
THAN C~NICAL
DAVl DIP. STETTNER
P~spec' ~jJ~yl Su b/~te~ .
ALPHA TESTING, INC. REPORT OF CONCRETE
22o9 W,scons,n St. COMPRESSION TEST
Suite 100
Dallas. Texas 75229
(214) 620-8911
PERRY HOt'lES, INC. DATE JUNE 26,1995
HOUSTON, TEXAS
,,oJ[cz PIACARTHUR PARK OUR REPORT NO. 94526--32
COPPELL, TEXAS
FIE LD DATA
,OCAT~O. OF CONCnETE PLACEMENT PAVINQ, 20' W. IO'N OF CENTER LINE OF
W. PENINSULA DR. CUL-DE-SAC
D~,TE PL,"CED 06/26/95 PLANT 6
TIME 11 : 00 DELIVER TICKET NO. 6018655
SLUMP 2 · 5 MIX PROPORTIONS (SSD) 4000
Ale CONTENT 4.5 CEMENT N/A
AIR TEMPERATURE 85 WATER N/A
CONCRETE TEMPERATURE 85 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DPI ADMIXTURE N/A
MIX DATA SUBMITTED BY LATT I PtORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE ~" X 12") ~"~'--Cylinders made by ALPHA
representabve
Lab Customer TyI~ Date ~e i ComlarremWe ~.. Cyhnders made by Architect's
No. No. Curmg Teeted Oa¥I ; Strength. P~i or Contractor's representahve
~ylinders p~cked up by ALPHA
56 94526 LAB 07/03/95 71 4940 laborato~.
57 94526 LAB 07/24/95 28 5640 ~ Cytinders delivered to ALPHA
laboratory.
58 '94526 LAB 07 / 24/95 28 5080 ~Compression test results comply w,th
: applicable specificattons.
59 .94526 LAB HOLD H J ~ CompreSSion test results do n<X comply
· !. w~th applicable specifications.
i
L..
[sp.~,,.~ .... ~ 28 4000
TYPE OF FRACTURE. IF OTHER
THAN C_..ONICAL
DAVl DIP. S~ETTNER
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 w,soo s, st COMPRESSION TEST
Suite 100
,,....;,, Dallas. Texas 75229
· '., (214) 620-891 ~
PERRY HOMES, INC. DATE: JUNE 26,1995
HOUSTON, TEXAS
,,oJEcz MACARTHUR PARK OuR REPORT NO. 94526-31
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR.
STATION 5+80
DATE .LACED 06/26/95 PLANT 7
TIME 03:30 DELIVER TICKET NO. 7011282
SLUMP 2o 5 MIX PROPORTIONS(SSO) 3000
AIR CONTENT 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/24/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY OM ADMIXTURE N/A
MIX DATA SUBM~1-rED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6- X 12") ~'~'"~Cylinders made by ALPHA
representative.
! Lab. Cultomer Type Olla __Om~va! Corem'crowe L_ orCylinderScontractor'smade by Architect's
[ No. No. Curing Te~tecl
representative
~"~Cyhnders p~cked up by ALPHA
52 !94526 LAB 06/30/95 7 i. 3050 laboratory.
53 ' 94526 LAB 07/21/95 28 4890 r~ Cylinders delivered to ALPHA
~ laboratory.
54 ' 94526 LAB I 07/21/95 ,28 4820 mpression test results comply with
applicable specifications.
55 94526 LAB HOLD H ~ CompreSSion test results do no( comply
w~th applicable specifications
isp~c,,,~a .... , 28 3000
TYPE OF FRACTURE, IF OTHER
THAN C(~NICAL
DAY I D~P. STET.TNER
Ct ub
ALPHA TESTING, INC. REPORT OF CONCRETE
220g W,scons,n St COMPRESSION TEST
Suite 100
Dallas. Texas 75229
· "/ (214) 620-8911
PERRY HOHES, INC. DATE'JUNE 26,1995
HOUSTON, TEXAS
,,oJEc~ HACARTHUR PARK OUR REPORT NO. 94526--35
COPPELL, TEXAS
-- ? FIE LO DATA
LOCATION OFCONCRETEPLACEMENT PAVING, E. BOUND ON W. PENINSULA DR.
STATION 5+75
DATE PLACED 06/26/95 PLANT 6
T,ME 05: 18 DELIVER TICKET NO. 6018655
S~UMP 2.5 MIX PROPORTIONS (SSD) 4000
AIR CONTENT 4. 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/27/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D~'} ADMIXTURE N/A
MIX DATA SUBMITTED BY LATT I HORE
COMPRESSION TEST RESULTS REMARKS
INOMINAL CYLINDER SIZE 6" X 12") I-'/'""Cylinders made by ALPHA
represenlahve
Date DaAyeeYs i Comp~mive F-' Cylinders made by Architect's
~ ' Customer Type i T~ed Stren~h.
No. No. Curi~ j or Contractor's representative.
Lab.
~ylinders p~cked up by ALPHA
' i
~ i ,
9 94526 LAB 07/24/95 28 i 4750 ~ ~lindem deliver~ to ALPHA
I i la~rato~.
':70 94526 LAB 07/24/95 28 5350 ~mpression te~ results comply w,th
; applicable sp~ifications.
71 94526 LAB HOLD H ~ ~mpre~on le~ resul~ ~ ~ ~mply
~ with applicable s~ficahons.
s.~:.~.~,.o.~ 28 4000
TYPE OF FRA~URE, IF ~HER
THAN CONILL
DAV I D~ ~T~TNER