Loading...
Peninsulas-LR 950623 ALPHA TESTING, INC. REPOR1 OF CONCRETE 2209 Wiscons,n St. COMPRESSIONTEST Suite 100 Dallas. Texas 75229 / (214) 620-8911 testeDeor PERRY HOPIES, INC. DATE: JUNE 23,1995 HOUSTON, TEXAS ,roJect MACARTHUR PARK OUR REPORT NO. 94526--30 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR. STATION 4+60 Oate PLACED 06/23/95 PLANT 7 TIMe 02: 25 DELIVER TICKET NO, 7011269 SLUMP 2 MIX PROPORTIONS (SSD) 3000 AIR CONTENT 4 · 5 CEMENT N/A AIR TEMPERATURE 9 5 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEIVED 06/24/95 COA.SE AGGREGATE N/A FIELD DATA SUBMITTED BY DM ADMIXTURE N/A MIX DATA SUBMII-rED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS NOMINAL CYI. INDER SIZE 6" X 12") ~ylinders made by ALPHA representative. · Lab Customer Type DIre ABe Coml~e~ive [] Cylinders made by Architect's No. No. Curi~ Te~ted Day1 S~'e~h, I%i or Contractor's representative. ~'"~linders picked up by ALPHA 48 ~ 94526 LAB 06/30/95 7 3490 laboratory. 49 i 94526 LAB 07/21/95 28 [] Cylinders delivered to ALPHA laborato~/. 50 94526 LAB 07/21/95 28 [] Compression test results comply with , applicable specifications. 51 194526 LAB HOLD H CompreS,~on test results do nol comply f with applicable specifications. ! t [] ,~,,o,~, 28 3000 TYPE OF FRACTURE, IF OTHER THAN CONICAL 1D P. STETTNER ctlutly Submitted TESTING. INC ALPHA TESTING, INC. REPOR'I OF CONCRETE 2209 Wiscons,n St COMPRESSIONTEST Suite 10o Dallas. Texas 75229 (214) 620-8911 T~.~TEO FOR PERRY HONES, INC. DATE: JUNE 23, 1995 HOUSTON, TEXAS P,OJEC~ MACARTHUR PARK our REPORT NO. 94526-29 COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR. STATION 2+90 DATE PLACED 06/23/95 PLANT 7 T~ME 12: 30 DELIVER TICKET NO. 701 1244 SLUMP 2 MIX PROPORTIONS (SSD) 3000 AIR CONTENT 4.5 CEMENT N/A AlE TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEIVED 06/24/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY DM ADMIXTURE N/A MIX DATA SUBMIT-TED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12"i ~"Cylinders made by ALPHA representative. Lab. ii Customer Type Data ~ Coml~lllive [] Cylinders made by Architect's No. [ No. Curing Te~ed Dayl Strength. Pli or Contractor's representalive. [~-Cylinders picked up by ALPHA 194526 LAB 06/30/95 7 3420 44 (aboratory. 45 ! 94526 i LAB 07/21/95 28 [] Cylinders delivered to ALPHA { laboratory. 46 94526 LAB 07/21/95 28 [] Compression test results comply with ~ applicable specifications. i47 94526I LAB HOLD H [] CompreSS~on test results do nol comply { { with applicable specifications. ' Isp~c,~,ca,,o~ 28 3000 TYPE OF FRACTURE, IF OTHER THAN COHICAL i:~AV ID P. STETTNER R~O~ fully Submitted ALPHA TESTING, lNG ALPHA TESTING, INC. REPOR't OF CONCRETE 22o9 W soons,n St COMPRESSION TEST Suite 1 O0 Dallas, Texas 75229 (214) 620-8911 PERRY HOPIES, INC. DATE:JUNE 23,1995 HOUSTON, TEXAS P.oJ£cT HACARTHUR PARK OUR REPORT NO. 94526--28 COPPELL~ TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, II¥o BOUND PENINSULA DR. STATION 1+75 DATE PLACED 06/23/95 PLANT 7 · ~ME 10:25 DELIVER TICKET NO. 7011220 SLUMP 2o 5 MIX PROPORTIONS (SSD) 3000 AIR CONTENT 4 CEMENT N/A AIR TEMPERATURE 90 WATER N/A CONCRETE TEMPERATURE 86 FINE AGGREGATE N/A DATE RECEWEO 06/24/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY DH ADMIXTURE N/A M~X DATA SUBMit-rED BY LATT I HORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12"1 [~'"-Cylinders made by ALPHA representative. Lab. i Customer Tyl3e Dete Aee Comm'e~*ve 1 [] Cylinders made by Architect's ~ No.~[ No. Curi~ Te~tedDayi Stretch, Psi or ContraCtor's representative. ~Cylinders picked up by ALPHA 40 94526 LAB 06/30/95 7 3660 laboratory. I 41 1 94526 LAB 07/21/95 28 [] Cylinders delivered to ALPHA , laboratory. 42 I 94526 LAB 07/21/95 28 [] Compression test results comply with I applicable specificalions. 43 194526 LAB HOLD H [] CompreSSion test results do n(:X compty I with applicable specifications. sp~,~,~ .... ~ 28 3000 TYPE OF FRACTURE, IF OTHER THAN CO~ICAL D~.VID P. STETTNER R..~ully Submitted ALPHA TESTING, INC. ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSIONTEST Suite 100 Dallas, Texas 75229 (214) 620-8911 T~STED~OR PERRY HOMES, INC. DATE: JUNE 23,1995 HOUSTON, TEXAS PROJECT HACARTHUR PARK OUR REPORT NO. 94526--30 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAY I NG, W. BOUND PEN I NSULA DR. STATION 4+60 DATE PLACED 06/23/95 PLANT 7 TIME 02 = 25 DELIVER TICKET NO. 7011269 SLUMP 2 MIX PROPORTIONS (SSO) 3000 AIR CONTENT 4 · 5 CEMENT N/A AiR TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEIVED 06/24/95 COARSE AGGREGATE N/A FIELD DA.TA SUBMITTED aY Dl~ ADMIXTURE N/A MIX DATA SUBMITTED BY LATT I PIORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE ~" X 12"1 ~ylinders made by ALPHA representative. i Lab. Cultomlr Type Dire _~ ComF~ivl [] Cylinders made by Architect's No. No. Curing TiltedDayt Strength. Pti or Contractor's representative. ~'~linders picked up by ALPHA 48 94526 LAB 06/30/95 7 3490 laboratory. 49 94526 LAB 07/21/95 28 43[0 [] Cylinders delivered to ALPHA laboratory. 50 94526 LAB 07/21/95 28 4:2_50 [~mpression test results comply with I applicable specifications. 51 94526 L AB HOLD H [] CompreSSion test results do nol comply with applicable specifications. s~ec,f,c~,,o~, 28 3000 TYPE OF FRACTURE, IF OTHER THAN C. ONICAL DAV ~ P. STE,T. TNER e ' II S~ ~.~ S ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St, COMPRESSION 'TEST Suite 100 Dallas. Texas 75229 / (214) 620-8911 I I I FOR PERRY HOHES, INC. D~TE: JUNE 23, 1995 HOUSTON, TEXAS P.oJEc~ MACARTHUR PARK OUR REPORT NO. 94526-29 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR. STATION 2+90 DATE[ PLACED 06/23/95 PLANT 7 T~E 12: 30 DELIVER TICKET NO. 7011244 SLUMP 2 MIX PROPORTIONS (SSD) 3000 AIR CONTENT 4 · 5 CEMENT N/A AIR TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEWED 06/24/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY OM ADMIXTURE N/A MIX DATA SUeMITTED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12') J~-Cylinders made by ALPHA representative. Lab. Customer Type Data ~ Coml~e~ive [] Cylinders made by Architect's No. No. Curing Te~ted Day~ S~h, Psi or Contractor's representative. 44 94526 LAB 06/30/95 7 3420 ~linders picked ~p by ALPHA laborato~. 45 94526 LAB 07/21/95 28 4240 ~ ~linde~ deli~r~ to ALPHA la~ralo~. 46 94526 LAB 07/21/95 28 4370 ~mpre~ion te~ results comply with applicable sp~ificalions. 47 94526 LAB HOLD H ~ ~mpre~on tea resu~ ~ n~ ~p~y with applicable s~ifications. ,s~,~,~,,o~, 28 3000 TYPE OF FRA~URE, IF ~HER THAN CON~L ~VI~P. STETTNER Ro~e~ ~ub~ ~ ALPHA TESTING, INC. REPORT OF CONCRETE 2209 wisooos,n st. COMPRESSION TEST Suite 100 Dallas. Texas 75229 (214) 620-8911 PERRY HOHES, INC. DATE:JUNE 23,1995 HOUSTON, TEXAS P.oJ~cT MACARTHUR PARK OUR REPORT NO. 94526-28 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, W. BOUND PENINSULA DR. STATION 1+75 DATE PLACED 06/23/95 PLANT 7 TIME 10 = 25 DELIVER TICKET NO. 7011220 SLUMP 2. 5 MIX PROPORTIONS (SSD) 3000 AIR CONTENT 4 CEMENT N/A AIR TEMPERATURE 90 WATER N/A CONCRETE TEMPERATURE 86 FINE AGGREGATE N/A DATE RECEIVED 06/24/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY DI~ ADMIXTURE N/A MIX DATA SUBMITTED BY LATT I HORE REMARKS COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12"! [~'-Cylinders made by ALPHA representative. Lab. Cultomer Type Dete _~ Coml~mive [] Cylinders made by Architect's No. No. Curin~ Te~tedDays St~th, Psi or Contractor's representative. [~linders picked up by ALPHA 40 94526 LAB 06/30/95 7 3660 laboratory. 41 94526 LAB 07/21/95 28 4400 [] Cylinders delivered to ALPHA .,<,,,,,laboratory. 42 94526 LAB 07/21/95 28 4;)90 ~ Compression test results comply with applicable specifications. 43 94526 LAB HOLD H [] CornpreSS~on test results do nct comply with applicable specifications. Sp~c,,,~,,o~ 28 3000 TYPE OF FRACTURE. IF OTHER THAN COfllC~L DAV I ~. STET. TNER Re Su