Loading...
Peninsulas-LR 950622 ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wiscons,n St COMPRESSIONTEST Suite 100 Dallas, Texas 75229 (214) 620-8911 I'ESTEDFOR PERRY HOMES DATE: JUNE 22, 1995 HOUSTON, TEXAS PROJECT MACARTHUR PARK OUR REPORT NO. 94526-27 COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVING, SOUTH BOUND, BENT TREE COURT AT STATION 3+20 DATE PLACED 06/22/95 PLANT 7 T~ME 03:40 DELIVER TICKET NO. 7011180 SLUMP 2 · 5 MIX PROPORTIONS (SSD) N/A AIR CONTENT 5. 0 ' CEMENT N/A AIR TEMPERATURE 9 5 WATER N/A CONCRETE TEMPERATURE 89 FINE AGGREGATE N/A DATE RECEWED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D o M. ADMIXTURE N/A M~X DATA SUBMiTtED aY LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6- X 12"1[~Cylinders made by ALPHA representative. , Lab. 1 Customer Type Date A~i Compri,live [] Cylinders made by Architect's No. No. Curmg Te~tedDavis Strength, Psi or Contractor's representative. [~/'/Cylinders picked up by ALPHA 36 94526 LAB 06/29/95 7 3,820 laboratory. 37 94'526 LAB 07/20/95 28 3,_590 [] Cylinders delivered to ALPHA 3oralory. 38 94526 LAB 07/20/95 28 4,,270 L~ Compression test results comply with applicable specifications. 39 94526 LAB HOLD H [] CompreSSion test results do no{ comply wilh applicable specifications. Spec,~,ca,,o~, 28 3,000 TYPE OF FRACTURE, IF OTHER THAN C,~ ICAL DAV ID' I:/, ST~/T'I7HER . I:b~Dect f ~IIv/~u b m ~t~{~l-..~ ALPHA TESTING, INC. REPORT OF CONCRETE 2209 VWscons,n St. COMPRESSION TEST Suite 100 Dallas. Texas 75229 (214) 620-8911 PERRY HONES DATE: JUNE 22, 1995 HOUSTON, TEXAS ,ROJECT HACARTHUR PARK OURREPORTNO. 94526--26 COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAY I NG, SOUTH BOUND BENT TREE CT. AT STATION 6+50 DATE PLACED 06/22/95 PLANT 3 TIME 01 : 55 DELIVER TICKET NO. 5013764 SLUMP 2,0 MIX PROPORTIONS (SSD) N/A AIR CONTENT 4, 5 CEMENT N/A AlE TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 90 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D. I~. ADMIXTURE N/A MIX DATA SUBMII-rED BY LATT I PIORE REMARKS COMPRESSION TEST RESULTS {NOMINAL CYLINDER SIZE ~" X 12') [~Cylinders mac]e by ALPHA representative. Lab. Cu~tom®r TyRe Dante Aee Comm'~e [] Cylinders made by Architect's No. No. Curing T~ted Day~ Strength, P;i or Contractor's representative. [~'~linders picked up by ALPHA 32 94526 LAB 06/29/95 7 3,780 laboratory. 33 [ 94526 LAB 07/20/95 28 5,700 [] Cylinders delivered to ALPHA laboratory. 34 94526 LAB 07/20/95 28 5,480 [~Compression test results comply with applicable specificalions. 35 94526 LAB HOLD H ' [] Compression lest results do ncX comply with applicable specifications. TYPE OF FRACTURE, IF OTHER THAN CONICAL DAY It~P./S~'EtTTNER ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSIONTEST Suite lOO Dallas, Texas 75229 (214) 620-8911 TESTEDFOR PERRY HOMES DATE: JUNE 22, 1995 HOUSTON, TEXAS ,.OJECT MACARTHUR PARK OUR REPORT NO. 94526-25 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, EAST BOUND, NORTH SHORE COURT AT STAT ION 1+50 DATE PLACED 06/22/95 PLANT 6 TIME 12: 20 DELIVER TICKET NO, 6018545 SLUMP 2.5 MIX PROPORTIONS (SSD) N/A AlE CONTENT 4 o 5 CEMENT N/A AIR TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DA'FA SUBMITTED BY D .M o ADMIXTURE N/A MIX DATA SUBMII-I'ED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12"1 [~'~linders made by ALPHA representative. Lab. Customer Typ~ Date Aee Corniced*ye [] Cylinders made by Architect's No. No. Curin~ T~I Days S~'~h, Psi Or Contractor's representative. [~]'~ylinders picked up by ALPHA 28 ! 94526 LAB 06/29/95 7 3,550 laboratory. 29 94526 LAB 07/20/95 28 4,470 [] Cylinders delivered to ALPHA laboratory. 30 94526 LAB 07/20/95 28 4 ,.~40 [~'"'~Compression test results comply with applicable specifications. 31 94526 L A B HOLD H [] Compression tes~ results do nol comply with applicable specifications. s~,~,ca,,o~s 28 3,000 TYPE OF FRACTURE, IF OTHER THAN DAY I I~ p~. ~'I}ET. TNER A~J~PI~ FESTING, ~NC. ALPHA TESTING, INC. REPORT OFCONCRETE 2209 W scons,n St. COMPRESSION 'TEST Suite 100 Dallas. Texas 75229 (214) 620-8911 teSTeDFOR PERRY HOMES DATE: JUNE 22, 1995 HOUSTON, TEXAS PROJECT MACARTHUR PARK OUR REPORT NO. 94526--24 COPPELL, TEXAS FIELD DATA LOC:ATION OF CONCRETE PLACEMENT PAVING, CENTER LINE EAST BOUND, NORTH SHORE COURT AT STATION 3+50 DATE .LACED 06/22/95 PLANT 6 TIME 11 : 30 DELIVER TICKET NO. 6018538 SLUMP 2 o 5 MIX PROPORTIONS (SSD) N/A AIR CONTENT 4.0 CEMENT N/A AIR TEMPERATURE 90 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D oM o ADMIXTURE N/A MIX DATA SUBMITTED 8¥ LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12") [~'~ylinders made by ALPHA representative. Lab. I Cultomer Tylme O.te ~ Comm'mi,~e 1 [] Cylinders made by Architect's No. No. Curi~ Te~t~Oats S~e~h. P~i or Contractor's representative. [~Cylinders picked up by ALPHA 24 94526 LAB 06/29/95 7 3,500 laboratory. 25 I 94526 LAB 07/20/95 28 3.940 [] Cylinders delivered to ALPHA laboratory. 26 94526 LAB 07/20/95 28 z~, 150 [~Compression tes~ res'ults comply with applicable specifications. 27 94526 LAB HOLD H [] CompreSSion test results do nol compty with applicable specifications. Sp~c,~,~,,o.. 28 3 ~ 000 TYPE OF FRACTURE, IF OTHER THAN,~ON P"..,AL DAV I~1~ P./~TE.TTNER ~[}~A~ TEb-~ NG. INC ~ ALPHA TESTING, INC. REPORT ,JF CONCRETE 2og Wiscons,n St. COMPRESSION TEST Suite 100 Dallas, Texas 75229 (214) 620-8911 TESTEDFOR PERRY HOMES DATE= JUNE 22, 1995 HOUSTON, TEXAS P~oJEc~ MACARTHUR PARK our REPORT NO. 94526--27 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVING, SOUTH BOUND, BENT TREE COURT AT STATION 3+20 DATE PLACED 06/22/95 PLANT 7 TIME 0 3: 40 DELIVER TICKET NO. 7011180 SLUM~ 2.5 MIX PROPORTIONS (SSD) N/A AIR CONTENT 5 . 0 CEMENT N/A AIR TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 89 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D. M o ADMIXTURE N/A MIX DATA SUBMITTED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE ~" X 12"1L~'~ Cyfinders made by ALPHA representative. Lab. Customer Type Date Coml~ve [] Cylinders made by Architect's No No. Curi~ T~ D~yl S~h, Contra~or's representative. or ' ~linders picked up by ALPHA 36 ~ 94526 LAB 06/29/95 7 3,820 laborato~. 37 [ 94526 LAB 07/20/95 28 ~ ~linde~ deli~r~ to ALPHA la~ralo~. 38 ~ 0~52~ k~8 0 7 / 2 0 / ~ 5 20 ~ ~m~m~ion t~ ro~ult~ com~lv ~ith I 39 ~ 94526 LAB HOLD H ~ ~mpre~on te~ resu~ ~ n~ ~mp~y  with applicable s~ifications. ~sp~,~,~,,o.~ 28 3,000 TYPE OF FRA~URE, IF ~HER THAN CONILL DAV I D P. STETTNEE ~ctfully SubmiUed ~A TESTING. INC. ALPHA TESTING, INC. REPORT ~F CONCRETE 2209 Wisoons,n st COMPRESSION TEST Suite 1OO Dallas. Texas 75229 (214) 620-8911 TESTEDFOn PERRY HOMES DATE: JUNE 22, 1995 HOUSTON, TEXAS ..oJEc~ MACARTHUR PARK OUR REPORT NO. 94526-26 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAV I NG, SOUTH BOUND BENT TREE CT. AT STATION 6+50 DATE PLACED 06/22/95 PLANT 3 TIME 01 : 55 DELIVER TICKET NO. 5013764 SLUMP 2 · 0 MIX PROPORTIONS (SSI:)) N/A AIR CONTENT 4 · 5 CEMENT N/A AIR TEMPERATURE 95 WATER N/A CONCRETE TEMPERATURE 90 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D .M. ADMIXTURE N/A MIX DATA SUBMITTED aY LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12")L~Cylinders made by ALPHA representative. Lab. Customer Type Dill Corem'alva [] Cylinders made by Architect's No. No. Curin~ T~ted St~h, Psi or Contractor's representative. [~ylinders picked up by ALPHA 32 i 94526 LAB 06/29/95 7 3,780 laboratory. i [] Cylinders delivered to ALPHA 33 I 94526 LAB 07/20/95 28 laboratory. 34 ! 94526 LAB 07/20/95 28 [] Compression test results comply with ; applicable specifications. 35 I 94526 LAB HOLD H [] CompreSSion test results do nol comply I with applicable specifications. I ISpecH,cat,ons 9~ ~ . 000 TYPE OF FRACTURE, IF OTHER THAN CONICAL DAY I D P. STETTNER tfully Submitlod TESTING, lNG ALPHA TESTING, INC. REPORT ~F CONCRETE 2209 vv sco, s,n st COMPRESSION TEST Suite 100 Dallas, Texas 75229 / (214) 620-8911 TI~STEOFOR PERRY HOMES O~TE: JUNE 22, 1995 HOUSTON, TEXAS P.OJEC'r MACARTHUR PARK OUR REPORT NO. 94526-25 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAY I NG, EAST BOUND, NORTH SHORE COURT AT STAT ION 1+50 DATE PLACED 06/22/95 PLANT 6 TIME 12: 20 DELIVER TICKET NO. 6018545 2. 5 MIX PROPORTIONS (SSD) N/A SLUMP AIR CONTENT 4 o 5 CEMENT N/A AIR TEMPERATURE 9 5 WATER N/A CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A DATE RECEWEO 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D oM o ADMIXTURE N/A MIX DATA SUBMII-rED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12") ~ylinders made by ALPHA representative. Lab. Customlr Tyl~e Dill Aaa Corem'em, v. [] Cylinders made by Architect's No. i No. Curi¢~ Te~ted Days Stretch, I~i or Contractor's representative. ~'"'Cylinders picked up by ALPHA 28 [ 94526 LAB 06/29/95 7 3,550 laboratory. 29 i 94526 LAB 07/20/95 28 [] Cylinders delivered to ALPHA I laboratory. 30 i 94526 LAB 07/20/95 28 [] Compression test results compty with I applicable specifications. 31 94526 LAB HOLD H i [] CompreSsoR test results do no~ comply ! with applicable specifications. ISpec,~,ca,,or, s ~, TYPE OF FRACTURE, IF OTHER 28 3 000 THAN CONICAL DAVID Po STETTNER .~jpl.~t I u Ily Submitted TESTING, INC. ALPHA TESTING, INC. REPOR'[ ,JF CONCRETE 22o9 w,sooosln st. COMPRESSION TEST Suite 1OO Dallas. Texas 75229 (214) 620-8911 T~:STEDFOR PERRY HOMES DATE: JUNE 22, 1995 HOUSTON, TEXAS P,OJECT MACARTHUR PARK OUR REPORT NO. 94526-24 COPPELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAV I NG, CENTER L I NE EAST BOUND, NORTH SHORE COURT AT STATION 3+50 DATE PLACED 06/22/95 PLANT 6 T~M~ 11: 30 DELIVER TICKET NO. 6018538 SLUMP 2.5 MIX PROPORTIONS (SSD) N/A AIR CONTENT 4 · 0 CEMENT N/A AIR TEMPERATURE 90 WATER N/A CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D. M. ADMIXTURE N/A MIX DATA SUBMIT'TED BY LATT I MORE REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6- X 12') [_fl~Cylinders made by ALPHA representative. Lab. ! Cultomer Type Dele Aee Comp~miva [] Cylinders made by Architect's No. i No. Curi~ Te~tedDays Str~l~h. Psi or Contractor's representative. ~ylinders picked up by ALPHA 24 i 94526 LAB 06/29/95 7 3,500 laboratory. 25 i 94526 LAB 07/20/95 28 [] Cylinders deliver~:l to ALPHA laDorato~. 26 I 94526 LAB 07/20/95 28 [] Compression test results comply with ~ applicable specifications. 27 94526 LAB HOLD H [] CompreSSion te~l results do n(X (x)mply I with applicable sl:~citications. i .~p,.c,,,~a,,or,~ 28 3,000 TYPE OF FRACTURE, IF OTHER THAN CONICAL DAVID P. STETTNER Fb[stpect fully Submitted ,~L~A TESTING, INC