Peninsulas-LR 950622 ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St COMPRESSIONTEST
Suite 100
Dallas, Texas 75229
(214) 620-8911
I'ESTEDFOR PERRY HOMES DATE: JUNE 22, 1995
HOUSTON, TEXAS
PROJECT MACARTHUR PARK OUR REPORT NO. 94526-27
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAVING, SOUTH BOUND, BENT TREE COURT
AT STATION 3+20
DATE PLACED 06/22/95 PLANT 7
T~ME 03:40 DELIVER TICKET NO. 7011180
SLUMP 2 · 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5. 0 ' CEMENT N/A
AIR TEMPERATURE 9 5 WATER N/A
CONCRETE TEMPERATURE 89 FINE AGGREGATE N/A
DATE RECEWED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D o M. ADMIXTURE N/A
M~X DATA SUBMiTtED aY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6- X 12"1[~Cylinders made by ALPHA
representative.
,
Lab. 1 Customer Type Date A~i Compri,live [] Cylinders made by Architect's
No. No. Curmg Te~tedDavis Strength, Psi or Contractor's representative.
[~/'/Cylinders picked up by ALPHA
36 94526 LAB 06/29/95 7 3,820 laboratory.
37 94'526 LAB 07/20/95 28 3,_590 [] Cylinders delivered to ALPHA
3oralory. 38 94526 LAB 07/20/95 28 4,,270 L~ Compression test results comply with
applicable specifications.
39 94526 LAB HOLD H [] CompreSSion test results do no{ comply
wilh applicable specifications.
Spec,~,ca,,o~, 28 3,000
TYPE OF FRACTURE, IF OTHER
THAN C,~ ICAL
DAV ID' I:/, ST~/T'I7HER .
I:b~Dect f ~IIv/~u b m ~t~{~l-..~
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 VWscons,n St. COMPRESSION TEST
Suite 100
Dallas. Texas 75229
(214) 620-8911
PERRY HONES DATE:
JUNE 22, 1995
HOUSTON, TEXAS
,ROJECT HACARTHUR PARK OURREPORTNO. 94526--26
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAY I NG, SOUTH BOUND BENT TREE CT. AT
STATION 6+50
DATE PLACED 06/22/95 PLANT 3
TIME 01 : 55 DELIVER TICKET NO. 5013764
SLUMP 2,0 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 4, 5 CEMENT N/A
AlE TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 90 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D. I~. ADMIXTURE N/A
MIX DATA SUBMII-rED BY LATT I PIORE
REMARKS
COMPRESSION TEST RESULTS
{NOMINAL CYLINDER SIZE ~" X 12') [~Cylinders mac]e by ALPHA
representative.
Lab. Cu~tom®r TyRe Dante Aee Comm'~e [] Cylinders made by Architect's
No. No. Curing T~ted Day~ Strength, P;i or Contractor's representative.
[~'~linders picked up by ALPHA
32 94526 LAB 06/29/95 7 3,780 laboratory.
33 [ 94526 LAB 07/20/95 28 5,700 [] Cylinders delivered to ALPHA
laboratory.
34 94526 LAB 07/20/95 28 5,480 [~Compression test results comply with
applicable specificalions.
35 94526 LAB HOLD H ' [] Compression lest results do ncX comply
with applicable specifications.
TYPE OF FRACTURE, IF OTHER
THAN CONICAL
DAY It~P./S~'EtTTNER
ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wisconsin St. COMPRESSIONTEST
Suite lOO
Dallas, Texas 75229
(214) 620-8911
TESTEDFOR PERRY HOMES DATE: JUNE 22, 1995
HOUSTON, TEXAS
,.OJECT MACARTHUR PARK OUR REPORT NO. 94526-25
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAVING, EAST BOUND, NORTH SHORE COURT
AT STAT ION 1+50
DATE PLACED 06/22/95 PLANT 6
TIME 12: 20 DELIVER TICKET NO, 6018545
SLUMP 2.5 MIX PROPORTIONS (SSD) N/A
AlE CONTENT 4 o 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DA'FA SUBMITTED BY D .M o ADMIXTURE N/A
MIX DATA SUBMII-I'ED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12"1 [~'~linders made by ALPHA
representative.
Lab. Customer Typ~ Date Aee Corniced*ye [] Cylinders made by Architect's
No. No. Curin~ T~I Days S~'~h, Psi Or Contractor's representative.
[~]'~ylinders picked up by ALPHA
28 ! 94526 LAB 06/29/95 7 3,550 laboratory.
29 94526 LAB 07/20/95 28 4,470 [] Cylinders delivered to ALPHA
laboratory.
30 94526 LAB 07/20/95 28 4 ,.~40 [~'"'~Compression test results comply with
applicable specifications.
31 94526 L A B HOLD H [] Compression tes~ results do nol comply
with applicable specifications.
s~,~,ca,,o~s 28 3,000
TYPE OF FRACTURE, IF OTHER
THAN
DAY I I~ p~. ~'I}ET. TNER
A~J~PI~ FESTING, ~NC.
ALPHA TESTING, INC. REPORT OFCONCRETE
2209 W scons,n St. COMPRESSION 'TEST
Suite 100
Dallas. Texas 75229
(214) 620-8911
teSTeDFOR PERRY HOMES DATE: JUNE 22, 1995
HOUSTON, TEXAS
PROJECT MACARTHUR PARK OUR REPORT NO. 94526--24
COPPELL, TEXAS
FIELD DATA
LOC:ATION OF CONCRETE PLACEMENT PAVING, CENTER LINE EAST BOUND, NORTH SHORE
COURT AT STATION 3+50
DATE .LACED 06/22/95 PLANT 6
TIME 11 : 30 DELIVER TICKET NO. 6018538
SLUMP 2 o 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 4.0 CEMENT N/A
AIR TEMPERATURE 90 WATER N/A
CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D oM o ADMIXTURE N/A
MIX DATA SUBMITTED 8¥ LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12") [~'~ylinders made by ALPHA
representative.
Lab. I Cultomer Tylme O.te ~ Comm'mi,~e 1 [] Cylinders made by Architect's
No. No. Curi~ Te~t~Oats S~e~h. P~i or Contractor's representative.
[~Cylinders picked up by ALPHA
24 94526 LAB 06/29/95 7 3,500 laboratory.
25 I 94526 LAB 07/20/95 28 3.940 [] Cylinders delivered to ALPHA
laboratory.
26 94526 LAB 07/20/95 28 z~, 150 [~Compression tes~ res'ults comply with
applicable specifications.
27 94526 LAB HOLD H [] CompreSSion test results do nol compty
with applicable specifications.
Sp~c,~,~,,o.. 28 3 ~ 000
TYPE OF FRACTURE, IF OTHER
THAN,~ON P"..,AL
DAV I~1~ P./~TE.TTNER
~[}~A~ TEb-~ NG. INC ~
ALPHA TESTING, INC. REPORT ,JF CONCRETE
2og Wiscons,n St. COMPRESSION TEST
Suite 100
Dallas, Texas 75229
(214) 620-8911
TESTEDFOR PERRY HOMES DATE= JUNE 22, 1995
HOUSTON, TEXAS
P~oJEc~ MACARTHUR PARK our REPORT NO. 94526--27
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAVING, SOUTH BOUND, BENT TREE COURT
AT STATION 3+20
DATE PLACED 06/22/95 PLANT 7
TIME 0 3: 40 DELIVER TICKET NO. 7011180
SLUM~ 2.5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5 . 0 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 89 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D. M o ADMIXTURE N/A
MIX DATA SUBMITTED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE ~" X 12"1L~'~ Cyfinders made by ALPHA
representative.
Lab. Customer Type Date Coml~ve [] Cylinders made by Architect's
No No. Curi~ T~ D~yl S~h,
Contra~or's representative.
or
' ~linders picked up by ALPHA
36 ~ 94526 LAB 06/29/95 7 3,820
laborato~.
37 [ 94526 LAB 07/20/95 28 ~ ~linde~ deli~r~ to ALPHA
la~ralo~.
38 ~ 0~52~ k~8 0 7 / 2 0 / ~ 5 20 ~ ~m~m~ion t~ ro~ult~ com~lv ~ith
I
39 ~ 94526 LAB HOLD H ~ ~mpre~on te~ resu~ ~ n~ ~mp~y
with applicable s~ifications.
~sp~,~,~,,o.~ 28 3,000
TYPE OF FRA~URE, IF ~HER
THAN CONILL
DAV I D P. STETTNEE
~ctfully SubmiUed
~A TESTING. INC.
ALPHA TESTING, INC. REPORT ~F CONCRETE
2209 Wisoons,n st COMPRESSION TEST
Suite 1OO
Dallas. Texas 75229
(214) 620-8911
TESTEDFOn PERRY HOMES DATE: JUNE 22, 1995
HOUSTON, TEXAS
..oJEc~ MACARTHUR PARK OUR REPORT NO. 94526-26
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAV I NG, SOUTH BOUND BENT TREE CT. AT
STATION 6+50
DATE PLACED 06/22/95 PLANT 3
TIME 01 : 55 DELIVER TICKET NO. 5013764
SLUMP 2 · 0 MIX PROPORTIONS (SSI:)) N/A
AIR CONTENT 4 · 5 CEMENT N/A
AIR TEMPERATURE 95 WATER N/A
CONCRETE TEMPERATURE 90 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D .M. ADMIXTURE N/A
MIX DATA SUBMITTED aY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12")L~Cylinders made by ALPHA
representative.
Lab. Customer Type Dill Corem'alva [] Cylinders made by Architect's
No. No. Curin~ T~ted St~h, Psi or Contractor's representative.
[~ylinders picked up by ALPHA
32 i 94526 LAB 06/29/95 7 3,780 laboratory.
i [] Cylinders delivered to ALPHA
33 I 94526 LAB 07/20/95 28 laboratory.
34 ! 94526 LAB 07/20/95 28 [] Compression test results comply with
; applicable specifications.
35 I 94526 LAB HOLD H [] CompreSSion test results do nol comply
I with applicable specifications.
I
ISpecH,cat,ons 9~ ~ . 000 TYPE OF FRACTURE, IF OTHER
THAN CONICAL
DAY I D P. STETTNER
tfully Submitlod
TESTING, lNG
ALPHA TESTING, INC. REPORT ~F CONCRETE
2209 vv sco, s,n st COMPRESSION TEST
Suite 100
Dallas, Texas 75229
/ (214) 620-8911
TI~STEOFOR PERRY HOMES O~TE: JUNE 22, 1995
HOUSTON, TEXAS
P.OJEC'r MACARTHUR PARK OUR REPORT NO. 94526-25
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAY I NG, EAST BOUND, NORTH SHORE COURT
AT STAT ION 1+50
DATE PLACED 06/22/95 PLANT 6
TIME 12: 20 DELIVER TICKET NO. 6018545
2. 5 MIX PROPORTIONS (SSD) N/A
SLUMP
AIR CONTENT 4 o 5 CEMENT N/A
AIR TEMPERATURE 9 5 WATER N/A
CONCRETE TEMPERATURE 88 FINE AGGREGATE N/A
DATE RECEWEO 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D oM o ADMIXTURE N/A
MIX DATA SUBMII-rED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12") ~ylinders made by ALPHA
representative.
Lab. Customlr Tyl~e Dill Aaa Corem'em, v. [] Cylinders made by Architect's
No. i No. Curi¢~ Te~ted Days Stretch, I~i or Contractor's representative.
~'"'Cylinders picked up by ALPHA
28 [ 94526 LAB 06/29/95 7 3,550
laboratory.
29 i 94526 LAB 07/20/95 28 [] Cylinders delivered to ALPHA
I laboratory.
30 i 94526 LAB 07/20/95 28 [] Compression test results compty with
I applicable specifications.
31 94526 LAB HOLD H
i [] CompreSsoR test results do no~ comply
! with applicable specifications.
ISpec,~,ca,,or, s ~, TYPE OF FRACTURE, IF OTHER
28
3
000
THAN CONICAL
DAVID Po STETTNER
.~jpl.~t I u Ily Submitted
TESTING, INC.
ALPHA TESTING, INC. REPOR'[ ,JF CONCRETE
22o9 w,sooosln st. COMPRESSION TEST
Suite 1OO
Dallas. Texas 75229
(214) 620-8911
T~:STEDFOR PERRY HOMES DATE: JUNE 22, 1995
HOUSTON, TEXAS
P,OJECT MACARTHUR PARK OUR REPORT NO. 94526-24
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT PAV I NG, CENTER L I NE EAST BOUND, NORTH SHORE
COURT AT STATION 3+50
DATE PLACED 06/22/95 PLANT 6
T~M~ 11: 30 DELIVER TICKET NO. 6018538
SLUMP 2.5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 4 · 0 CEMENT N/A
AIR TEMPERATURE 90 WATER N/A
CONCRETE TEMPERATURE 87 FINE AGGREGATE N/A
DATE RECEIVED 06/23/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D. M. ADMIXTURE N/A
MIX DATA SUBMIT'TED BY LATT I MORE
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6- X 12') [_fl~Cylinders made by ALPHA
representative.
Lab. ! Cultomer Type Dele Aee Comp~miva [] Cylinders made by Architect's
No. i No. Curi~ Te~tedDays Str~l~h. Psi or Contractor's
representative.
~ylinders picked up by ALPHA
24 i 94526 LAB 06/29/95 7 3,500
laboratory.
25 i 94526 LAB 07/20/95 28 [] Cylinders
deliver~:l
to
ALPHA
laDorato~.
26 I 94526 LAB 07/20/95 28 [] Compression test results comply with
~ applicable specifications.
27 94526 LAB HOLD H [] CompreSSion te~l results do n(X (x)mply
I with applicable sl:~citications.
i
.~p,.c,,,~a,,or,~ 28 3,000
TYPE OF FRACTURE, IF OTHER
THAN CONICAL
DAVID P. STETTNER
Fb[stpect fully Submitted
,~L~A TESTING, INC