Peninsulas-LR 950609 ALPHA TESTING,
2209 Wisconsin St., Suite 100 REPORT OF FIELD
Dallas, Texas 75229 COMPACTION TESTS
(214) 620-8911
TESTED FOR: PERRY HOMES DATE:
HOUSTON, TEXAS
NcARTHUR PARK 94526-20
PROJECT: OUR REPORT NO.
COPPELL , TEXAS
TEST DATA:
TEST ~ ELEV. SOIL I0 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATEDEPTH~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT*
NUMBER % PCF % PCF
55 0(::>/09 FG 2L 20.0 104.0 21.0 101 97 3-A
56 06/09 FG 2L 20.0 104.0 22.0 102 98 3-A
57 06/09 FG 2L 20.0 104.0 21.6 102 99 3-A
TEST LOCATION:
55 PAVING - EAST PENINSULA STA. 6+00; CENTER LINE
56 PAVING - EAST PENINSULA STA. 4+00; CENTER LINE
57 PAVING - EAST PENINSULA STA. 1+50; CENTER LINE
1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respectfully Submitted,
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TESTING, INC.
4. CEMENT TREATED D. RETEST David P. Stettner
ALPHA TESTING, INC. MECHANICAL LIME
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 STABILIZATION REPORT
(214) 620-8911 FINAL MIX
TESTED FOR PERRY HOMES, INC. DATE 06/09/95
HOUSTON, TEXAS
MacARTHER PARK
PROJECT COPPELL, TEXAS OURREPORTNO. 94526--19
EAST PENINSULA
AreaofWork:
06/07/95 6
Date lime initially applied Average final compacted depth: inches.
Date of final mixing 06/09/95
TEST DATA
~ Passing ~ Passing
SampleLocation I 3/4' Sieve #4 Sieve
5TA. 6+00 E. PENINSULA DR. 100 76
STA. 4+00 E. PENINSULA DR. 100 80
STA. 1+50 E. PENINSULA DR. 100 77
Remarks: