Loading...
Peninsulas-LR 950609 ALPHA TESTING, 2209 Wisconsin St., Suite 100 REPORT OF FIELD Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR: PERRY HOMES DATE: HOUSTON, TEXAS NcARTHUR PARK 94526-20 PROJECT: OUR REPORT NO. COPPELL , TEXAS TEST DATA: TEST ~ ELEV. SOIL I0 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NUMBER % PCF % PCF 55 0(::>/09 FG 2L 20.0 104.0 21.0 101 97 3-A 56 06/09 FG 2L 20.0 104.0 22.0 102 98 3-A 57 06/09 FG 2L 20.0 104.0 21.6 102 99 3-A TEST LOCATION: 55 PAVING - EAST PENINSULA STA. 6+00; CENTER LINE 56 PAVING - EAST PENINSULA STA. 4+00; CENTER LINE 57 PAVING - EAST PENINSULA STA. 1+50; CENTER LINE 1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respectfully Submitted, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TESTING, INC. 4. CEMENT TREATED D. RETEST David P. Stettner ALPHA TESTING, INC. MECHANICAL LIME 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 STABILIZATION REPORT (214) 620-8911 FINAL MIX TESTED FOR PERRY HOMES, INC. DATE 06/09/95 HOUSTON, TEXAS MacARTHER PARK PROJECT COPPELL, TEXAS OURREPORTNO. 94526--19 EAST PENINSULA AreaofWork: 06/07/95 6 Date lime initially applied Average final compacted depth: inches. Date of final mixing 06/09/95 TEST DATA ~ Passing ~ Passing SampleLocation I 3/4' Sieve #4 Sieve 5TA. 6+00 E. PENINSULA DR. 100 76 STA. 4+00 E. PENINSULA DR. 100 80 STA. 1+50 E. PENINSULA DR. 100 77 Remarks: