Loading...
ST9801-LR000720 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-J~-.-.-.-.-.-.-.-.-.~0 Mr. Kenneth Griffin, P.E. City of Coppell 255 Parkway Boulevard Post Office Box 478 Coppell, Texas 75019-4409 Project No.: Project: Location: Report No.: 1520COP03 Coppell Road Paving & Drainage Lime Treated Paving Subgrade 71 RESULTS OF FIELD DENSITY TESTS TEST DATE NO. 115 07/20/00 116 07/20/00 117 07/20/00 118 07/20/00 119 07/20/00 120 07/20/00 i 21 07/20/00 RETEST OF TEST NUMBER TEST LOCATION Coppell Rd. at Sta. 6+30, SB Lane Coppell Rd. at Sta. 5+90, SB Lane Coppell Rd. at Sta. 6+10, NB Lane Coppell Rd. at Sta. 6+50, NB Lane Coppell Rd. at Sta. 2+75, NB Lane Coppell Rd. at Sta. 4+62, SB Lane Coppell Rd. at Sta. 5+25, NB Lane LWT/ PROCTOR FIELD FIELD PERCENT DEPTH TEST DENSITY MOISTURE OF NO. PCF % SPEC/FIED COMPACTION Grade 7109 115.0 14.4 99.1 Grade 7109 112.2 15.0 96.7 Grade 7109 117.7 15.2 101.5 Grade 7109 116.0 14.2 100.0 Grade 7109 113.5 13.1 97.8 Grade 7109 110.6 13.1 95.3 Grade 7109 114.9 13.0 99.0 TESTS PERFORMED BY: M. Kashem TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937 REMARKS: *Percent Moisture is Below Specifications; **Percent Compaction is Below Specification. PROCTOR NO.: 7109 - 116.0 @ 13.0% Moisture SPECIFICATION: 95% Compaction @ Optimum + DISTRIBUTION: City ofCoppell - Larry Davis ) _ SIGNED OF 1 TEST RESULTS ARE NOT NECESSARILY INDICATIVE OF THE QUALITY OF APPARENTLY IDENTICAL OR S[]~]I,AR SAMPLES THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL WITHOUT THE APPROVAL OF STANTECH