Peninsulas-LR 950605 ALPHA TESTING, ,,~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 DAILY FIELD REPORT
(214) 620-8911
PERRY HONES INC. 06/05/95
TESTED FOR HOUSTON, TEXAS DATE
McARTHUR PARK 94526-15
PROJECT COPPELL, TEXAS OUR REPORT NO.
WEATHER: CLOUDY DATE:
TEMPERATURE RANGE: 70 TO:
ALPHA Representative: K. N.
THE ALPHA TECHNICIAN TRAVELLED TO THE PRO3ECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE TO PERFORM FIELD GRADATION TESTING AND OBTAIN A
SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS.
ONE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION:
SAMPLE A- (LIMED SUBGRADE) EAST PENINSULA DRIVE, STATION 4+00
THE SAMPLE WAS RETURNED TO THE LABORATORY FOR ANALYSIS.
TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
A TOTAL OF 7 FIELD GRADATIONS WERE PERFORMED ON THE LIME STABILIZED
MATERIALS ON THE REFERENCED DRIVE.
ALPHA TESTIk INC. MEC, ,ANICAL LIME
2209 Wisconsin St., ~uite 100
Dallas, Texas 75229 STABILIZATION REPORT
(214) 620-8911 FINAL MIX
TESTED FOR PERRY HONES, INC. DATE 06/05/9.5
HOUSTON, TEXAS
NcARTHUR PARK
PROJECT COPPELL, TEXAS OUR REPORTNO. 94526--15A
V/~R IOUS STREETS
Area of Work:
Datelimeinitiallyapplied 06/02/95 Averagefinalcompacteddepth: 6 inches.
Dateoffinalmixing 06/05/95
TEST DATA
· P&ssing · Passing
SampleLocation I 3/4' Sieve ~4 Sieve
BENT TREE CT. STA. 2+00 100 61
BENT TREE CT. STA. 4+00 100 60
BENT TREE CT. STA. 6+00 100 61
NORTH SHORE CT. STA. 2+50 100 63
EAST PENINSULA DR. STA. 1+OO 1OO 80
ERST PENINSULA DR. STA. 4+00 100 83
EAST PENINSULA DR. STA. 7+00 100 75
Remarks: