Loading...
Peninsulas-LR 950605 ALPHA TESTING, ,,~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 DAILY FIELD REPORT (214) 620-8911 PERRY HONES INC. 06/05/95 TESTED FOR HOUSTON, TEXAS DATE McARTHUR PARK 94526-15 PROJECT COPPELL, TEXAS OUR REPORT NO. WEATHER: CLOUDY DATE: TEMPERATURE RANGE: 70 TO: ALPHA Representative: K. N. THE ALPHA TECHNICIAN TRAVELLED TO THE PRO3ECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE TO PERFORM FIELD GRADATION TESTING AND OBTAIN A SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. ONE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SAMPLE A- (LIMED SUBGRADE) EAST PENINSULA DRIVE, STATION 4+00 THE SAMPLE WAS RETURNED TO THE LABORATORY FOR ANALYSIS. TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. A TOTAL OF 7 FIELD GRADATIONS WERE PERFORMED ON THE LIME STABILIZED MATERIALS ON THE REFERENCED DRIVE. ALPHA TESTIk INC. MEC, ,ANICAL LIME 2209 Wisconsin St., ~uite 100 Dallas, Texas 75229 STABILIZATION REPORT (214) 620-8911 FINAL MIX TESTED FOR PERRY HONES, INC. DATE 06/05/9.5 HOUSTON, TEXAS NcARTHUR PARK PROJECT COPPELL, TEXAS OUR REPORTNO. 94526--15A V/~R IOUS STREETS Area of Work: Datelimeinitiallyapplied 06/02/95 Averagefinalcompacteddepth: 6 inches. Dateoffinalmixing 06/05/95 TEST DATA · P&ssing · Passing SampleLocation I 3/4' Sieve ~4 Sieve BENT TREE CT. STA. 2+00 100 61 BENT TREE CT. STA. 4+00 100 60 BENT TREE CT. STA. 6+00 100 61 NORTH SHORE CT. STA. 2+50 100 63 EAST PENINSULA DR. STA. 1+OO 1OO 80 ERST PENINSULA DR. STA. 4+00 100 83 EAST PENINSULA DR. STA. 7+00 100 75 Remarks: