Peninsulas-LR 950602 ALPHA TESTING, INC. REPORT OF CONCRETE
22o9 w sooos,n s, COMPRESSION TEST
Suite 100
Dallas, Texas 75229
(214) 620-8911
PERRY HOMES, I NC. DATE: JUNE 2, 1995
TESTED FOR HOUSTON, TEXAS
MACARTHUR PARK DU. RE.ORT NO. 94526-- 16
P.OJECT COPPELL, TEXAS
FIELD DATA
INLET ON WEST PENINSULA
LOCATION OF CONCRETE PLACEMENT
DATE PLACED 06/02/95 PLANT 1
TIME 15:00 DELIVER TICKET NO. 13926
SLUMP 3 · 5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5. 75~ CEMENT N/A
AIR TEMPERATURE 89 WATER N/A
CONCRETE TEMPERATURE 92 FINE AGGREGATE N/A
DATE RECEIVED 06/03/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY U. S. ADMIXTURE N/A
MIX DATA SUBMITTED BY RED I -PI I X
REMARKS
COMPRESSION TEST RESULTS
INOMINAL CYLINDER SIZE 6" X 12'9 .~- Cylinders made by ALPHA
representative.
Lab. Cumtomar Type Date Com,'mire ~ Cylinders made by Architect's
No. No. Curi~ Treed StretCh, Psi or Contractor's representative.
8 94526 LAB 06/09/95 7 3,790 ~Cylinders picked up by ALPHA
laborato~.
9 94526 LAB 06/30/95 28 [] Cylinders delivered to ALPHA
laboratory,
10 94526 LAB 06/30/95 28 [] Compression test results comply with
11 i 94526 LAB HOLD H applicable specifications.
[] Compression test results do no{ comply
with applicable specifications.
,Spec,f~cat,or~ ~-u ~ ~
TYPE OF FRAC'TURE, IF OTHER
N CONILL
tfullySubmitted
D P. STETTNER
ALPHA TESTING, INC
ALPHA TESTING, INC. REPOR~ OF CONCRETE
22o9 Wiscons,n St COMPRESSION TEST
Suite 100
Dallas, Texas 75229
(214) 620-8911
PERRY HOMES, I NC. DATE JUNE 2, 1995
TFSTED FOR
HOUSTON, TEXAS
MACARTHUR PARK OUR REPORT NO. 94526- 16
~.OJ~CT COPPELL, TEXAS
FIELD DATA
INLET ON WEST PENINSULA
LOCATION OF CONCRETE PLACEMENT
DATE PLACED 06/02/95 PLANT 1
TIME 15:00 DELIVER TICKET NO. 13926
SLUMP 3.5 MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5. 75~ CEMENT N/A
AIR TEMPERATURE 8 9 WATER N/A
CONCRETE TEMPERATURE 92 FINE AGGREGATE N/A
DATE RECEIVED 06/03/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY J. S. ADMIXTURE N/A
MIX DATA SUBMII-rED BY RED I -M I X
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6"X 12"1 ,k~ Cylinders made by ALPHA
representative
Lab, Custom®r Typ~ Oete Coml~'~ive [] Cylinders made by Architect's
No. No. Cur*r~ Te~ted DEV,, or Contractor's representative.
SWe~gth,
8 94526 LAB 06/09/95 7 3,790 ~Cylinders picked up by ALPHA
i ; laboratory.
9 i 94526 LAB 06/30/95 28 4720 [] Cylinders delivered to ALPHA
laboratory.
10 ~, 94526 LAB 06/30/95 28 4580 t~co~"~- mpression
! applicable specifications.test results
comply
with
11 t 94526 LAB HOLD H
[] CompreSSion test results do nct comply
I with applicable specifications.
Specd ~cat,or, s
ALPHA TESTING, ,..C.
2209 Wisconsin St., Suite 100 REPORT OF FIELD
Dallas, Texas 75229 COMPACTION TESTS
(214) 620-8911
TESTED FOR: PERRY HOMES DATE: 06/02/95
HOUSTON, TEXAS
PROJECT: McARTHUR PARK 94526-1
COPPELL, TEXAS OUR REPORT NO.
TEST DATA:
TEST ~,ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATEDEPTH '"""-,.~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT*
NUMBER % PCF % PCF
36 06/02 FG-5.0 1 20.0 102.0 20.6 99 97 1-A
37 06/02 FG-3.0 1 20.0 102.0 21.7 98 96 1-A
38 06/02 FG-4.0 1 20.0 102.0 20.0 100 98 1-A
39 06/02 FG-2.0 1 20.0 102.0 20.9 97 95 1-A
40 06/02 FG 1 20.0 102.0 20.4 100 98 1-A
41 06/02 FG 1 20.0 102.0 21.5 101 99 1-A
42 06/02 FG 1 20.0 102.0 20.3 99 97 1-A
TESTLOCATION:
36 8" SANITARY SEWER LINE "O" STATION 2+00
37 8" SANITARY SEWER LINE "D" STATION 2+20
38 8" SANITARY SEWER LINE "D" STATION 5+00
39 8" SANITARY SEWER LINE "D" STATION 8+00
40 8" WATER LINE W. PENINSULA DR. 20'W + IO'S OF 8LK A LOT 13
4i 8" WATER LINE W. PENINSULA DR. 30'W + 20'S OF 8LK A LOT 14
i42 8" WATER LINE W. PENINSULA DR. iO'S + 5' W OF 8LK A LOT 10
1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Re~miffe .~
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
oo,s.o co ., w..
4. CEMENT TREATED D. RETEST
ALPHA TESTING, ,..~.
2209 Wisconsin St., Suite 100 REPORT OF FIELD
Dallas, Texas 75229 COMPACTION TESTS
(214) 62o-8911
TESTED FOR: PERRY HOMES DATE: 06/02/95
HOUSTON, TEXAS
PROJECT: McARTHUR PARK OUR REPORT NO. 94526--13A
COPPELL, TEXAS
TEST DATA:
TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATEDEPTH~,~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT*
NUMBER % PCF % PCF
43 06/02 FG 1 20.0 102.0 21.8 99 97 1-A
44 06/02 FG-1.0 1 20.0 102.0 21
45 06/02 FG ! 20.0 102.0 20.0 99 97 1-A
TEST LOCATION:
43 8" WATER LINE W. PENINSULA OR. 20'5 + iO'W OF BLK A LOT li
44 27" RCP PIPE STORM SEWER LINE "A" STATION 2+00
45 27" RCP PIPE STORM SEWER LINE "A" STATION 3+00
1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS Resl3ectf~lr~Submitted. ]
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS~/~/ / ~.//~TuE~TING~ i ~,~¥
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
4. CEMENT TREATED D. RETEST