Loading...
Park West CC(17)-CS001117 MEMORANDUM FROM DEPARTMENT OF ENGINEERING To: Mike Martin, Assr City Engineer Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis C~rT, ~re~! From: Lar~5~.~stru¢fion Inspector Date: November 17, 2000 RE: WALK-THRU for Parkwest Commerce Ctr., Bldg. III, Lot 3R, Block 8 A final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Tuesday, November 21, 2000 at 2:00 p.m. If I can be of further assistance please let me know. cc: Lee Stone, Commercial Inspector Potter Concrete (fax 214-689-1066) Jimmy Laxon, McFadden & Miller (fax: 972-401-1399) John Skinner, Barson Utilities, Inc. (fax: 214-941-8533) "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"