Loading...
Peninsulas-LR 950523 ALPHA TESTING, INC. 2209 Wisconsin St.. Suite 100 REPORT OF FIELD Dallas. Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR: PERRY HONES DATE: 05/23/95 HOUSTON , TEXAS PROJECT: NcARTHUR PARK OURREPORTNO. 94526--8 COPPELL, TEXAS TEST DATA: MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. DATE DEPTH NUMBER % PCF % PCF 18 05/23 FG-2.0 1 20.0 102.0 20.0 98 96 1-A 19 05/23 FG-I.O 1 20.0 102.0 21.1 99 97 1-A 20 05/23 FG-3.0 1 20.0 102.0 20.5 101 99 1-A 21 05/23 FG-2.0 1 20.0 102.0 21.7 101 99 1-A 22 05/23 FG-I.O 1 20.0 102.0 20.4 99 97 i-A 23 05/23 FG-2.0 1 20.0 102.0 20.5 102 100 1-A 74 05/23 FG-I.O 1 20.0 102.0 20.3 99 97 1-A TESTLOCATION: 18 12" R C P PIPE LINE "8" STATION 2+70 19 12" R C P PIPE LINE "8" STATION 1+50 20 8" WATER LINE ALONG 8ENTTREE CT. PAVING STA. 6+00 21 8" WATER LINE ALONG 8ENTTREE CT. PAVING STA. 4+90 22 8" WATER LINE ALONG 8ENTTREE CT. PAVING STA. 2+00 23 8" WATER LINE ALONG NORTH SHORE CT. PAVING STA. 2+50 24 8" WATER LINE ALONG NORTH SHORE CT. PAVING STA. 4+00 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS ly S 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS f ALPHA TES,,T,H~, INCJ J 4. CEMENT TREATED D. RETEST