Peninsulas-LR 950512 ALPHA TESTING, ,.
2209 Wisconsin St.. Suite 100 REPORT OF FIELD
Dallas. Texas 75229 COMPACTION TESTS
(214) 620-8911
TESTED FOR: PERRY HOHES DATE: O5/1_ 2/<:)5
HOUSTON, TEXAS
PROJECT: McARTHUR PARK OUR REPORT NO. 94520--7
COPPELL, TEXAS
TEST DATA:
TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATE DE PTH~.~ NUMBER MOISTURE% DRY PcFDENSITY MOISTURE% DRY PcFDENSITY COMPACTION COMMENT*
15 05/12 F6-3 I 20.0 102.0 21 .3 97 96 1-A
16 05/12 FG-2 1 20.0 102.0 20.0 tO0 98 1-A
iF 05/1_2 FG-1 I 20.0 102.0 20.6 99 97 i-A
TEST LOCATION:
15 8" WATER LINE PAVING STA. 2+34, EAST PENINSULA
16 8" WATER LINE PAVING STA. 3+50, EAST PENINSULA
17 8" WATER LINE PAVING STA. 4+70, EAST PENINSULA
1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS R__ullyes.~c~
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ~~I2~/"ALPHA TESTI ~
4. CEMENT TREATED D. RETEST ~~ L t.